Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Uploaded On or After
Uploaded On or Before
Displaying 201 - 300 of 335
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - 2022 Annual Report - 3-4 pH vs Colourimetric Zn - May 19_23.xlsx (33.55 KB)
CZN - 2022 Annual Report - Tabulated SNP Results - May 19_23.xls (77.5 KB)
CZN - 2022 Water License Annual Report - May 24_23.pdf (37.18 MB)
Designs and As-Builts
Document Received/Sent Uploaded
CZN – Flood Protection Berm and WSP Southern Dyke Evaluation Report V1.1 - Review Summery Table - May2_24.pdf (484.36 KB)
CZN – Approval - Flood Protection Berm and WSP Southern Dyke Evaluation Report V1.1 - May2_24.pdf (174.7 KB)
CZN - Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1.1 - Feb22_24.pdf (82.4 MB)
CZN - Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1.1 - Cover Letter - Jan9_24.pdf (184.27 KB)
CZN - Approval - Flood Protection Berm and Water Storage Pond Evaluation Report – Submission Extension - Dec 7_23.pdf (171.7 KB)
CZN - Flood Protection Berm and Water Storage Pond Southern Dyke Evaluation Report - Extension Request - Nov16_23.pdf (132.64 KB)
CZN - Revisions Required - Flood Protection Berm and Water Storage Pond Southern Dyke Evaluation Report - Nov 7_23.pdf (598.53 KB)
CZN - Letter Re Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1 - May 24_23.pdf (222.44 KB)
CZN - Flood Protection Berm and WSP Southern Dyke - Evaluation Report - V1 - May 19_23.pdf (41.88 MB)
Inspection Reports
Document Received/Sent Uploaded
CZN - Annual Geotechnical Inspection Report - Part 1 of 2 - Nov19_24.pdf (15.63 MB)
CZN - Geotechnical Inspection Report - Part 2 of 2 - Nov19_24.pdf (24.95 MB)
CZN - Notice of Annual Geotech Inspection - Aug2_24.pdf (138.51 KB)
CZN - Mine Site - Inspection Report - Apr30_24.pdf (2.6 MB)
CZN - Geotechnical Inspection Requirements - Correspondence - Dec5_23.pdf (234.13 KB)
CZN - Flood Protection Berm and Water Storage Pond - 2023 Annual Geotechnical Inspection - Nov22_23.pdf (56.56 MB)
CZN - Inspection Report - Apr28_23.pdf (2.71 MB)
CZN - Flood Protection Berm and Water Storage Pond - 2022 Annual Geotechnical Inspection - Mar 29_23.pdf (32.8 MB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - Prairie Creek Site Closure Notification 2024 Season_Nov4_24.pdf (109.91 KB)
CZN - 2024 Site Opening Notification - Mar15_24.pdf (104.85 KB)
CZN - Annual Review Condition - Mar1_23.pdf (163.33 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - SNP Report - Nov 2024 RAW DATA - Dec12_24.pdf (5.8 MB)
CZN - SNP results from November 12-13 2024 RAW DATA - Dec12_24.xlsx (141.61 KB)
CZN - SNP Report - Nov 2024 RAW DATA - Dec12_24.xlsx (170.55 KB)
CZN - SNP results from November 6 2024 RAW DATA - Dec12_24.xlsx (69.04 KB)
CZN - SNP results from Sep 10 2024 RAW DATA - Nov22_24.xlsx (69.1 KB)
CZN - SNP results from Sep 10 2024 - Oct30_24.pdf (1.49 MB)
CZN - SNP Report - Sep 2024 RAW DATA - Oct30_24.xlsx (253.75 KB)
CZN - SNP Report - Sep 2024 - Oct30_24.pdf (5.15 MB)
CZN - SNP results from Sep 24 2024 RAW DATA - Oct30_24.xlsx (81.19 KB)
CZN - SNP results from Sep 24 2024 - Oct30_24.pdf (1.85 MB)
CZN - SNP results from Sep 18b 2024 - Oct30_24.pdf (1.99 MB)
CZN - SNP results from Sep 18b 2024 RAW DATA - Oct30_24.xlsx (129.01 KB)
CZN - SNP results from Sep 18a 2024 RAW DATA - Oct30_24.xlsx (116.88 KB)
CZN - SNP results from Sep 18a 2024 - Oct30_24.pdf (1.96 MB)
CZN - SNP Report - Oct 2024 RAW DATA - Nov22_24.xlsx (171.05 KB)
CZN - SNP Report - Oct 2024 - Nov22_24.pdf (5.64 MB)
CZN - SNP results from Oct 14 2024 RAW DATA - Nov22_24.xlsx (69.76 KB)
CZN - SNP results from Oct 28-29 2024 RAW DATA - Nov22_24.xlsx (178.59 KB)
CZN - SNP results from Oct 1 2024 RAW DATA - Nov22_24.xlsx (70.09 KB)
CZN - SNP results from acute toxicity test on Sep 24 2024 - Oct30_24.pdf (1022.6 KB)
CZN - SNP Report - July 2024 - Aug27_24.pdf (6.39 MB)
CZN - SNP Report - August 2024 - Sep27_24.pdf (6.37 MB)
CZN - SNP Acute Toxicity Results - sampled Aug 13 2024 - Sep27_24.pdf (1.35 MB)
CZN - SNP Acute Toxicity Results - sampled Aug 8 2024 - Sep27_24.pdf (1.32 MB)
CZN - SNP results from Aug 29 to Sep 2 2024 - Sep27_24.pdf (1.54 MB)
CZN - SNP results from Aug 26 2024 - Sep27_24.pdf (1.57 MB)
CZN - SNP results from Aug 13 2024 - Sep27_24.pdf (1.48 MB)
CZN - SNP results from Aug 8 2024 - Sep27_24.pdf (2.01 MB)
CZN - SNP results from Aug 6 2024 - Sep27_24.pdf (772.99 KB)
CZN - SNP results from Jul 16 2024 RAW DATA - Aug27_24.xlsx (68.46 KB)
CZN - SNP results from Jul 26 2024 RAW DATA - Aug27_24.xlsx (166.62 KB)
CZN - SNP Report - July 2024 RAW DATA - Aug27_24.xlsx (245.76 KB)
CZN - SNP Report - August 2024 RAW DATA - Sep27_24.xlsx (243.64 KB)
CZN - SNP results from Jul 30 2024 RAW DATA - Aug27_24.xlsx (68.79 KB)
CZN - SNP Report - June 2024 RAW DATA - Jul 25_24.xlsx (126.81 KB)
CZN - SNP Report - June 2024 - Jul 25_24.pdf (2.28 MB)
CZN - SNP Report - May 2024 - Jul 8_24.pdf (2.36 MB)
CZN - SNP Report - May 2024 RAW DATA - Jul 8_24.xlsx (113.48 KB)
CZN - SNP Report - April 2024 - May 24_2024.pdf (1.49 MB)
CZN - SNP Report - Sep 29 - Oct 31 2022.pdf (10.54 MB)
CZN - Mine and ASR - SNP - Analytical Results May-Nov 2023 - Dec18_23.xlsx (245.6 KB)
CZN - SNP Report - April 2023 - Jan4_24.pdf (706.74 KB)
CZN - SNP Report - Jan 2023 - Jan4_24.pdf (681.25 KB)
CZN - SNP Report - March 2023 - Jan4_24.pdf (694.07 KB)
CZN - SNP Report - May 2023 - Dec22_23.pdf (2.12 MB)
CZN - SNP Report - Nov 2023 - Dec20_23.pdf (2.85 MB)
CZN - SNP Report - Oct 2023 - Dec20_23.pdf (5.98 MB)
CZN - SNP Correspondence - Dec 2023 - Jan10_24.pdf (200.3 KB)
CZN - SNP Report - Feb 2023 - Jan4_24.pdf (690.77 KB)
CZN - SNP Report - Water Use Information - 2023 - Jan4_24.pdf (190.23 KB)
CZN - SNP Report - Aug 2023 - Dec18_23.pdf (4.45 MB)
CZN - SNP Report - July 2023 - Dec18_23.pdf (9.64 MB)
CZN - SNP Report - June 2023 - Dec12_23.pdf (4.91 MB)
CZN - SNP Report - Sept 2023 - Dec18_23.pdf (4.59 MB)
CZN - SNP Report June 1 - 31_23 - Dec12_23.pdf (5.64 MB)
CZN - Mine - QAQC and SNP Requirements not met - Nov30_23.pdf (145.74 KB)
CZN - SNP Report May 21 - Jun 19 - July 21_23.pdf (3.51 MB)
CZN - SNP Report Sep 29 - Dec 31 - Jan 20_23.pdf (8.49 MB)
Spill Reports
Document Received/Sent Uploaded
CZN - Spill Report - September 5, 2024 - Sept 5_24.pdf (377.91 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
CZN - Annual Management Plan Review - 2024 - March12_24.pdf (155.96 KB)
CZN - Type A Licence and Permit - Submission Requirements - Oct17_22.pdf (143.68 KB)
Engagement Plan
Document Received/Sent Uploaded
CZN – Approved - Engagement Plan V2 - Apr26_23.pdf (183.24 KB)
CZN - Engagement Plan - Version 2 - Mar 2_23.pdf (1.16 MB)
CZN - Engagement Plan V2 - Incomplete - Jan10_23.pdf (177.52 KB)
CZN - Engagement Plan V2 - Incomplete Conformity Review - Jan10_23.pdf (84.21 KB)
CZN - Mineral Exploration - EP V1 - July 21-20.pdf (1.63 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
CZN - Mineral Exploration - SCP V2 - Sept23-20.pdf (9.25 MB)
Waste Management Plan
Document Received/Sent Uploaded
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB)
Waste Rock and Tailings Management
Document Received/Sent Uploaded
CZN - Mineral Exploration - GVP V2.2 - Sept25-20.pdf (1020.79 KB)
Water Management
Document Received/Sent Uploaded
CZN – Water and Wastewater Management Plan V1.1 - Review Comments and Responses.pdf (393.08 KB)
CZN - Water and Wastewater Management Plan - Version 1.2 - Board Staff Conformity - June 1_23.pdf (149.54 KB)
CZN - Water and Wastewater Management Plan - Version 1.2 - May 31_23.pdf (9.23 MB)
CZN – Water and Wastewater Management Plan - Version 1 - Review Comments and Responses - Mar 2_23.pdf (363.06 KB)
CZN – Revisions Required - Water and Wastewater Management Plan - Version 1.1 - May 17_23.pdf (214.57 KB)
CZN - Water and Wastewater MP - V1.1 - Apr11_23.pdf (9.23 MB)
CZN - Letter to MVLWB re Water and Wastewater Management Plan V1 - Mar10_23.pdf (218.46 KB)
CZN – Not Approved - Water and Wastewater Management Plan Version 1 - Mar3_23.pdf (265.62 KB)