Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - 2023 Water License Annual Report - Mar29_24.pdf (1.61 MB)
CZN – 2022 Annual Report - Review Comment Table - Jul20_23.pdf (613.4 KB)
CZN – Acknowledgement - 2022 Annual Report - Jul 25_23.pdf (171.38 KB)
CZN - 2022 Annual Report - Tabulated SNP Results - May 19_23.xls (77.5 KB)
CZN - 2022 Annual Report - Tabulated SNP Results EQC - May 19_23.xls (248.5 KB)
CZN - 2022 Water License Annual Report - May 24_23.pdf (37.18 MB)
CZN - 2022 Annual Report - 3-4 Diss Zn vs Colourimetric Zn - May 19_23.xlsx (33.55 KB)
CZN - 2022 Annual Report - 3-4 pH vs Colourimetric Zn - May 19_23.xlsx (33.55 KB)