Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 15 of 15
8. Closure and Reclamation
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
CZN - Mineral Exploration CRP - V2.1 - Jan31_24.pdf (5.42 MB)
CZN - Closure and Reclamation Plan - Version 2.1 Extension Request - Dec11_23.pdf (160.49 KB)
CZN - Closure and Reclamation Plan - Version 2 - Workshop Summary Notes - Nov 6_23.pdf (401.35 KB)
CZN - Closure and Reclamation Plan - Version2 - Workshop - Final Agenda - Oct 31_23.pdf (261.93 KB)
CZN - Closure and Reclamation Plan - Version 2 - Workshop - CZN Presentation - Nov2_23.pdf (2.35 MB)
CZN - Closure and Reclamation Plan - Version 2 - Revised Responses for Workshop - July23.pdf (624.71 KB)
CZN - Closure and Reclamation Plan - Workshop - Draft Agenda - Oct 24_23.pdf (331.74 KB)
CZN – Closure and Reclamation Workplan Extension and Admin Update - Review Summery Table and Responses - Sept28_23.pdf (352.49 KB)
CZN - Closure and Reclamation Plan - Version 2 - Deferral Decision - Engagement Record - July 31_23.pdf (176.49 KB)
CZN - Closure and Reclamation Plan - Version 2 - Deferral Decision - Response to Board Directive - July 31_23.pdf (245.14 KB)
CZN - Type A Mining and Milling - draft Licence - Admin Update - July 24_23.pdf (1.24 MB)
CZN - Closure and Reclamation Plan Work Plan - Extension Request - July 5_23.pdf (160.23 KB)
CZN – Closure and Reclamation Plan V2 - Review Comments and Responses - Jun5_23.pdf (597.97 KB)
CZN – Deferral - Closure and Reclamation Plan - Version 2 - May 17_23.pdf (172.11 KB)
CZN - CRP - Mineral Exploration - V2 - Dec22_22.pdf (5.23 MB)