Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
7. Monitoring Programs
AEMP - Program
Document Received/Sent Uploaded
CZN - AEMP WG Update - Dec2023 - Jan4_24.pdf (210.61 KB)
CZN - AEMP Baseline Plan - Workshop Summary Notes - Nov 6_23.pdf (297.51 KB)
CZN - CZN AEMP Workshop Presentation - Oct 27_23.pdf (2.85 MB)
CZN - Board Staff AEMP Workshop Presentation - Oct30_23.pptx (422.37 KB)
CZN - AEMP Baseline Monitoring Plan - Workshop - Draft Agenda - Oct 24_23.pdf (389.51 KB)
CZN - AEMP Working Group Update - Oct12_23.pdf (4.96 MB)
CZN - AEMP Baseline Monitoring Plan - Information Request - Extension Request - Sept 29_23.pdf (182.38 KB)
CZN - AEMP Baseline Monitoring Plan - Information Request - Extension Request - Sept 1_23.pdf (178.84 KB)
CZN - AEMP Baseline Monitoring Plan - Information Request - Aug 15_23.pdf (211.18 KB)
CZN - AEMP Baseline Monitoring Plan - Response Extension Request and Memo - Aug 4_23.pdf (546.91 KB)
CZN - AEMP Baseline Monitoring Plan - Jun 22_23.pdf (16.89 MB)