Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Uploaded On or After
Uploaded On or Before
Displaying 201 - 204 of 204
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
PPML - Closure and Reclamation Plan - V2 - Submission Extension - Review Comment Table - Dec 1_23.pdf (377.77 KB)
PPML - Closure and Reclamation Plan - V2 - Submission Extension Request - Oct27_23.pdf (160.46 KB)
9. GIS Data
GIS Data
Document Received/Sent Uploaded
PPML - GIS Data - Roads and Camp - Nov27_20.zip (79.11 KB)
Shapefiles
Document Received/Sent Uploaded
PPML - GIS Data - Drilling Areas - Feb26_21.zip (5.24 KB)