Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
PPML - Preliminary Screening - Staff Report and Comments - April 13_21.pdf (6.99 MB)
MV2020C0017 MV2020L8-0012 - PPML - Notification - Preliminary Screening Determination to Review Board - Apr15-21.pdf (611.14 KB)
3. Amendment Application
Preliminary Screening
Document Received/Sent Uploaded
PPML – Amendment – Review Summery Table - Preliminary Screening - Jul28_23.pdf (911.64 KB)
PPML – Amendment - Notification - Preliminary Screening Determination - Jul28_23.pdf (515.08 KB)
PPML - Notification - Preliminary Screening Determination - Sep1_22.pdf (398 KB)