Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Uploaded On or After
Uploaded On or Before
Displaying 1 - 18 of 18
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
PPML - Engagement Plan - V2.2 - Conformity Confirmation - Apr22_22.pdf (148.99 KB)
PPML - Engagement Plan V2.2 - Apr6_22.pdf (337.41 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
PPML - Spill Contingency Plan - V1.1 - Conformity Confirmation - Apr22_22.pdf (157.5 KB)
PPML - Spill Contingency Plan V1.1 - Apr6_22.pdf (8.39 MB)
Waste Management Plan
Document Received/Sent Uploaded
PPML - Waste Management Plan - V1.3 - Conformity Confirmation - Apr22_22.pdf (158.53 KB)
PPML - Waste Management Plan V1.3 - Apr6_22.pdf (1.19 MB)
PPML - Waste Management Plan V1.1 - Mar8_22.pdf (1.07 MB)
Water Management
Document Received/Sent Uploaded
PPML - Water Management Plan V1.2 - Aug30_22.pdf (2.9 MB)
PPML - Water Withdrawal Plan V2.1 - Aug31_22.pdf (47.92 MB)
PPML - Water Management Plan V1.2 - Comformity Confirmation - Aug31_22.pdf (2.99 MB)
PPML - Revisions Required - Water Management Plan v1.1 - Aug8_22.pdf (216.74 KB)
PPML - Water Management Plan v1.1 - Staff Report and Comments - Aug8_22.pdf (550.31 KB)
PPML – Water Withdrawal Plan v2 - Staff Report and Comments - Jul29_22.pdf (627.58 KB)
PPML – Approved - Water Withdrawal Plan V2 - Jul25_22.pdf (208.45 KB)
PPML - Water Management Plan V1.1 - Jul4_22.pdf (1003.07 KB)
PPML - Revisions Required - Water Management Plan Version 1 - Jun2_22.pdf (239.97 KB)
PPML - Water Withdrawal Plan - V2.0 - May16_22.pdf (54.61 MB)
PPML - Water Management Plan V1 - Mar16_22.pdf (892.99 KB)