Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
PPML - Pump Test Compatability Authorization - Email Chain - Nov29_23.pdf (1.03 MB)
PPML - Pump Test Compatibility Authorization - Nov29_23.pdf (617.24 KB)
PPML - Pump Test Compatability Request and Approval - Nov10_23.pdf (1.38 MB)
PPML - Correspondence Re Water Consumption - Feb 1_23.pdf (491.2 KB)
PPML - Water Compatibility Test Results - Oct7_22.pdf (6.67 MB)