Skip to main content

Pine Point Mining Limited - MV2020C0017

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board


Uploaded On or After
Uploaded On or Before
Displaying 101 - 121 of 121
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
PPML - Inspection Report - September 9, 2022 - Sep19_22.pdf (6.58 MB)
Operations and Notifications
Document Received/Sent Uploaded
PPML - Response to October 12, 2022 Inspection Report - Nov29_22.pdf (144.21 KB)
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
PPML - Engagement Plan - V2.2 - Conformity Confirmation - Apr22_22.pdf (148.99 KB)
PPML - Engagement Plan V2.2 - Apr6_22.pdf (337.41 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
PPML - Spill Contingency Plan - V1.1 - Conformity Confirmation - Apr22_22.pdf (157.5 KB)
PPML - Spill Contingency Plan V1.1 - Apr6_22.pdf (8.39 MB)
Waste Management Plan
Document Received/Sent Uploaded
PPML - Waste Management Plan - V1.3 - Conformity Confirmation - Apr22_22.pdf (158.53 KB)
PPML - Waste Management Plan V1.3 - Apr6_22.pdf (1.19 MB)
Water Management
Document Received/Sent Uploaded
PPML - Water Management Plan V1.1 - Jul4_22.pdf (1003.07 KB)
7. Monitoring Programs
WEMP - Wildlife Effects Monitoring Program
Document Received/Sent Uploaded
PPML - 2022 Annual Wildlife Management and Monitoring Plan Report - Oct5_23.pdf (12.34 MB)
PPML - Noncompliance with reporting requirements of the approved WMMP - Aug4_23.pdf (270.59 KB)
PPML - Approved - Wildlife Monitoring and Management Plan - Mar21_22.pdf (425.02 KB)
PPML - Wildlife Monitoring and Management Plan - Version 2.1 - Dec23_21.pdf (5.34 MB)
PPML - Wildlife Management and Monitoring Plan - Version 1.1 - Cover Letter - Aug18_21.pdf (159.89 KB)
PPML - Wildlife Management and Monitoring Plan - Version 1.1 - Aug18_21.pdf (6.27 MB)
PPML - Wildlife Management and Monitoring Plan Determination - Apr30_21.pdf (2.44 MB)
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
PPML – Closure and Reclamation Plan Version 2.0 - Not Approved - Nov21_24.pdf (498.74 KB)
PPML – Closure and Reclamation Plan Version 2.0 - Reveiw Comment Table - Nov21_24.pdf (555.66 KB)
PPML - Closure and Reclamation Plan - V2 - May9__24.pdf (1.93 MB)
9. GIS Data
GIS Data
Document Received/Sent Uploaded
MV2020L8-0012 MV2020C0017 - PPML - GIS Data - Roads and Camp - Nov27_20.zip (79.11 KB)
Shapefiles
Document Received/Sent Uploaded
PPML - GIS Data - Drilling Areas - Feb26_21.zip (5.24 KB)