Skip to main content

Pine Point Mining Limited - MV2020C0017

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
PPML - Inspection Report - October 10, 2023 - Nov14_23.pdf (3.27 MB)
PPML - Inspection Report - October 11, 2023 - Nov14_23.pdf (4.22 MB)
PPML - Inspection Report - January 25, 2023 - Feb2_23.pdf (9.36 MB)
PPML - Inspection Report - January 27, 2023 - Feb22_23.pdf (2.25 MB)
PPML - Inspection Report - October 12, 2022 - Nov23_22.pdf (1.4 MB)
PPML - Inspection Report - September 9, 2022 - Sep19_22.pdf (6.58 MB)
Operations and Notifications
Document Received/Sent Uploaded
PPML - Response to October 12, 2022 Inspection Report - Nov29_22.pdf (144.21 KB)