Skip to main content

Pine Point Mining Limited - MV2020C0017

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
PPML - Amendment and Schedule Change Request - Cover Letter - Jul19_22.pdf (1.63 MB)
PPML - Amendment Request - DRAFT Land Use Permit Conditions - Jul19_22.pdf (341.69 KB)
Preliminary Screening
Document Received/Sent Uploaded
PPML - Notification - Preliminary Screening Determination - Sep1_22.pdf (398 KB)