Skip to main content

Canadian Zinc Corporation - MV2014L8-0006

For non-federal portion of the road. 

​Construction and use of an all weather road, with creek crossing structures exceeding 5m in width. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. 

This Water Licence is accompanied by Permit MV2014F0013 and Water Licence MV2019L8-0002

Please Note: This Water Licence and associated Permit are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 69 of 69
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - ASR - 2023 Annual Report - Apr1_24.pdf (14.19 MB)
CZN - ASR - Correspondence that 2022 Annual Report not submitted - Nov30_23.pdf (159.77 KB)
CZN - Annual Report 2021 - Revised - Jul13_22.pdf (101.75 KB)
CZN - 2020 Annual Permit and Licence Report - Staff Report - Jun17_21.pdf (370.24 KB)
CZN - Acknowledgment - 2020 Annual Permit and Licence Report - Jun17-21.pdf (121.15 KB)
CZN - All Season Road Project - Letter Re Annual Report - Mar 23_21.pdf (125.91 KB)
MV2008L2-0002 MV2019L2-0006 MV2014L8-0006 MV2019L8-0002 MV2014F0013 - CZN - Annual Reports - Staff Report and Comments.pdf (1.1 MB)
MV2014L8-0006 - CZN – 2019 Annual Reports - Accepted - Oct9-20.pdf (191.39 KB)
MV2014L8-0006 - CZN - Letter Re 2019 Annual Report - May21_20.pdf (127.87 KB)
Designs and As-Builts
Document Received/Sent Uploaded
CZN - ASR - As-built Non-Conformity Correspondence - Nov30_23.pdf (150.84 KB)
CZN - ASR - Phase 2 - Mapbook - KM 0-103 - Nov16_23.pdf (13.92 MB)
CZN - ASR - Phase 2 - Mapbook - KM 103-170 - Nov16_23.pdf (11.69 MB)
CZN - ASR - Memo Re Winter Road As-Built and Deactivation Drawings - July 24_23.pdf (8.06 MB)
CZN - ASR - Non-Typical Winter Road As-Built Drawings - July 24_23.pdf (9.16 MB)
CZN - ASR - Winter Road Deactivation Drawings - July 24_23.pdf (11.55 MB)
CZN - ASR - Phase 1 DCP V2.1 - Conformity Confirmation - Jan10_23.pdf (149.87 KB)
CZN - ASR - Phase 1 DCP V2.1 - Dec9_22.pdf (52.38 MB)
CZN - Acknowledgment - Design and Construction Plan v2 - Nov22_22.pdf (202.67 KB)
CZN - ASR - Phase 1 DCP V2 - ITRP Letter - Nov8_22.pdf (168.58 KB)
CZN - ASR - Phase 1 DCP V2 - Nov8_22.pdf (55.79 MB)
CZN - ASR - Phase 1 DCP V2 Appendix B - Nov8_22.pdf (50.96 MB)
CZN - ASR - Phase 1 DCP V2 Liard Ice Bridge Stamped - Nov8_22.pdf (8.06 MB)
CZN - ASR – Acknowledgement - Design and Construction Plan - Oct14_22.pdf (193.08 KB)
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB)
CZN - ASR - DCP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB)
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB)
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - Inspector Response - Inquiry to work under MV2014L8-0006 WL for construction of Ice Bridge - Nov24_21.pdf (145.98 KB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - ASR - Winter Road Deactivation Plan - KP 0 to 17 - Mar30_23.pdf (3.85 MB)
CZN - ASR - Winter Road Deactivation Plan - KP 101 to 169 - Mar30_23.pdf (3.82 MB)
CZN - ASR - Winter Road Deactivation Plan - Email Correspondence - Mar29_23.pdf (143.14 KB)
CZN - ASR - Annual Report Submission Date Extension - Mar28_23.pdf (102.89 KB)
CZN - ASR - Request to Change Annual Report Submision Date - Mar17_23.pdf (165.22 KB)
CZN - ASR - Construction Report - Nov19_22.pdf (8.97 MB)
CZN - ASR - Water Use Limits - Correspondence - GNWT Lands and LWB.pdf (152.9 KB)
CZN - ASR - Water Use Limits - Correspondence - GNWT ENR.pdf (168.01 KB)
CZN - ASR - Notification - Phase 1 Winter Road Commencement - Oct 5_22.pdf (262.33 KB)
CZN - ASR - Notification of Commencemet Staging Area - Sep20_22.pdf (333.34 KB)
CZN - ASR - Request for Pioneer Winter Road Emergency Approval - Apr6_22.pdf (148.01 KB)
CZN - ASR - Re Pioneer Winter Road Request - Inspector Response - Apr5_22.pdf (199.01 KB)
CZN - ASR - Winter 2021-22 Construction Deferral - Dec20_21.pdf (282.32 KB)
Other
Document Received/Sent Uploaded
CZN - ASR - Liard Ice Bridge Report - Jan15_23.pdf (463.71 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - ASR - SNP Report - April 2023 - Feb13_24.pdf (2.04 MB)
CZN - ASR - SNP Report - August 2023 - Feb13_24.pdf (544.09 KB)
CZN - ASR - SNP Report - December 2023 - Feb13_24.pdf (545.17 KB)
CZN - ASR - SNP Report - February 2023 - Feb13_24.pdf (2.05 MB)
CZN - ASR - SNP Report - Jan 2023 water use - Feb28_23.pdf (4.48 MB)
CZN - ASR - SNP Report - January 2023 - Feb13_24.pdf (2.05 MB)
CZN - ASR - SNP Report - July 2023 - Feb13_24.pdf (544.92 KB)
CZN - ASR - SNP Report - June 2023 - Feb13_24.pdf (3.22 MB)
CZN - ASR - SNP Report - March 2023 - Feb13_24.pdf (2.04 MB)
CZN - ASR - SNP Report - May 2023 - Feb13_24.pdf (2.13 MB)
CZN - ASR - SNP Report - November 2023 - Feb13_24.pdf (544.67 KB)
CZN - ASR - SNP Report - October 2023 - Feb13_24.pdf (544.99 KB)
CZN - ASR - SNP Report - September 2023 - Feb13_24.pdf (4.18 MB)
CZN - ASR - SNP Report Ice Bridge Data - Jan23_23.pdf (6.46 MB)
CZN -Mine and ASR - SNP - Analytical Results May-Nov 2023 -Dec18_23.xlsx (245.59 KB)
CZN - ASR - SNP Report - January 2024 - Feb15_24.pdf (543.49 KB)
CZN - ASR - SNP Report - December 2022 - Feb13_24.pdf (2.32 MB)
CZN - ASR - SNP Report - November 2022 - Jan29_24.pdf (165.8 KB)
CZN - ASR - SNP Report - October 2022 - Jan29_24.pdf (165.93 KB)
CZN - ASR - QAQC Plan Approval - Cover Letter - Mar12_24.pdf (693.78 KB)
CZN - ASR - QAQC Plan Approval - Mar12_24.pdf (238.36 KB)
CZN - ASR - SNP Reports - Response to Conformity Commentnts on 2022 and 2023 SNP Reports - Feb 27_24.pdf (203.27 KB)
CZN - ASR - SNP Report - October 2022 - Jan 29_24.pdf (165.93 KB)
CZN - ASR - SNP Report - November 2022 - Jan 29_24.pdf (165.8 KB)
CZN - ASR - Correspondence that 2022 SNP Reports not submitted - Nov30_23.pdf (159.77 KB)
CZN - ASR - SNP Report - Feb28_23.pdf (4.48 MB)
CZN - ASR - SNP Report - Jan23_23.pdf (6.46 MB)