​Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River.

This Permit is accompanied by Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002

Please Note: This Permit and associated Water Licence are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006

Documents

Displaying 1 - 71 of 71
E.g., 06/23/2019
E.g., 06/23/2019

2. Initial/Renewal Application

Application and Related Docs
Document Received/Sent Uploaded
MV2014F0013 - CZN - Letter re Sundog diversion - Apr 6_19.pdf (11.29 MB) April 8, 2019 April 9, 2019
MV2014F0013 - CZN - ASR N Liard Map - Mar22_19.pdf (1.58 MB) March 22, 2019 March 22, 2019
MV2014F0013 - CZN - ASR - Preliminary draft Permit conditions - Mar15-19.pdf (474.6 KB) March 15, 2019 March 15, 2019
MV2014F0013 - CZN - App 1-2 Access Road Maps 1-10,000 Version 2 - Mar13-19.pdf (74.67 MB) March 13, 2019 March 13, 2019
MV2014F0013 - CZN - Draft Work Plan - March12-19.pdf (96.22 KB) March 12, 2019 March 12, 2019
MV2014F0013 - CZN - App17-2 Health Safety and ERP - Feb20-19.pdf (45.99 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 27 App.5-1 Draft Rare Plnt Mngt Plan and Data - Feb20-19.pdf (39.73 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 17-1 Draft Spill Contingency Plan - Feb20-19.pdf (25.16 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 16-1 Draft Explosives Mngt Plan - Feb20-19.pdf (22.13 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 22 Avalanche Hzrd and Safety - Feb20-19.pdf (22.69 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 20 RECLAIM Cost Estimate Non-Federal Lands - Feb20-19.pdf (1.62 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 500 - Feb20-19.pdf (34.51 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 400 - Feb20-19.pdf (25.5 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 300 - Feb20-19.pdf (29.04 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 200 - Feb20-19.pdf (20.59 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 100 - Feb20-19.pdf (28.48 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 000 - Feb20-19.pdf (36.57 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-5 Non-Typical Winter Road Section Design Drawings - Feb20-19.pdf (42.79 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-4 Draft Land Use Permit - Feb20-19.pdf (459.48 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-3 Draft Road Construction Mngt Plan - Feb20-19.pdf (3.05 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-2 Access Road Maps 1-10000 - Feb20-19.pdf (74.65 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-1 Access Road Maps 1-150,000 - Feb20-19.pdf (2.01 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 4-1 Draft Traffic Control Plan - Feb20-19.pdf (3.31 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 15-1 Draft Road Operations and Maintenance - Feb20-19.pdf (22.11 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 14-1 Draft Sediment Erosion Ctrl Plan - Feb20-19.pdf (19.82 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 13-1 Draft Geochemical Verification Program - Feb20-19.pdf (6.69 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 12-1 Draft Waste Mngt Plan - Feb20-19.pdf (13.59 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 11-1 Draft Road CRP - Feb20-19.pdf (22.87 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 10-1 Preliminary Geotechnical Report - Feb20-19.pdf (24.1 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 10 Draft Permafrost Mngt Plan and Data - Feb20-19.pdf (51.59 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 9 Draft Invasive Species Mngt Plan and Data - Feb20-19.pdf (60.88 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 8-1 AIA non-technical summary - Feb20-19.pdf (296.03 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 7 Engagement Records- Letters- Plan - Feb20-19.pdf (2.93 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 5 Draft WMMP and Data Report - Feb20-19.pdf (45.63 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 3-1 Candidate CVs - Feb20-19.pdf (3.22 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 2-1 Updated Commitments Table - Feb20-19.pdf (594.67 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-16 Liard River Crossing Drawings - Feb20-19.pdf (5.52 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-14 Studies to Date - Feb20-19.pdf (304.96 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-15 Hoverbarge Details - Feb20-19.pdf (1.03 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-13 Construction Camp Layout Drawings - Feb20-19.pdf (7.65 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-10 Draft Borrow Pit Mngt an Rec Plan - Feb20-19.pdf (341.45 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-9 Summary of Minor Stream Crossings - Feb20-19.pdf (391.26 KB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-8 Stream Crossing Hydrology Data - Feb20-19.pdf (7.65 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-7 Stream Crossing General Arrngmt Drawings - Feb20-19.pdf (59.12 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 900 - Feb20-19.pdf (20.5 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 800 - Feb20-19.pdf (26.39 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 700 - Feb20-19.pdf (28.18 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-6 ASR Design Drawings - Series 600 - Feb20-19.pdf (15.09 MB) February 20, 2019 March 6, 2019
MV2014F0013 - CZN - App 1-11-12 Borrow Pit Information - Feb20-19.pdf (17.31 MB) February 20, 2019 March 6, 2019
MV2014F00013- CZN - Post-EA Information Package - Feb20-19.pdf (3.87 MB) February 20, 2019 March 5, 2019
MV2014F0013 - CZN - New LUP Application - Further Studies Requested 22 2 b - Staff Report - Nov8-18.pdf (144.01 KB) November 8, 2018 November 9, 2018
MV2014F0013 - CZN - Receipt for LUP Application Fee - Apr24-14.pdf (91.74 KB) April 23, 2014 April 23, 2014
MV2014F0013 - CZN - New LUP and WL Application - Apr23-14.pdf (7.14 MB) April 22, 2014 April 22, 2014
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2014F0013 - CZN - All-Season Road Project - Extension to Comment Response Deadline Granted - May1-19 .pdf (80.61 KB) May 1, 2019 May 3, 2019
MV2014F0013 - CZN - request for comment response deadline extension Apr28_19.pdf (92.24 KB) April 28, 2019 May 1, 2019
MV2014F0013 - CZN - All-Season Road Project - Additional Information Submitted - Comment Deadline Extended - Apr9-19.pdf (103.83 KB) April 9, 2019 April 10, 2019
MV2014F0013 - CZN - ECCC Review Extension Request - Mar15-19.pdf (167.62 KB) March 15, 2019 March 15, 2019
MV2014F0013 - CZN - Review Extension Request - Mar14-19.pdf (416.67 KB) March 14, 2019 March 14, 2019
MV2014F0013 - CZN - Letter of Support - Nahga Dehe Dene Band - May14-14.pdf (73.31 KB) May 13, 2014 May 13, 2014
MV2014F0013 - CZN - Request for Technical Committee meeting - Parks Canada -May5-14.pdf (52.8 KB) May 4, 2014 May 4, 2014
MV2014F0013 - CZN - Request for review and comments on NEW LUP and WL Application - May2-14.pdf (146.98 KB) May 1, 2014 May 1, 2014
Environmental Assessment
Document Received/Sent Uploaded
MV2014F0013 - CZN - Report of Environmental Assessment - All-Weather Road - RFD - MVEIRB - Sept12-17.pdf (4.4 MB) September 27, 2017 October 12, 2018
MV2014F0013 - CZN - Minister to Review Board - Decision on EA - Oct9-18.pdf (141.26 KB) October 9, 2018 October 11, 2018
MV2014F0013 - CZN - Review Board to Minister - Letter to recommend approval of Report of EA - Sept12 -17.pdf (136.74 KB) September 12, 2017 October 11, 2018
MV2014F0013 - CZN - All-Season Road - Post-EA Information Pkg Required - Oct9-18.pdf (2.52 MB) October 9, 2018 October 10, 2018
MV2014F0013 - CZN - Staff Report - EA Referral for new applications - May22-14.pdf (740.62 KB) May 21, 2014 May 21, 2014
MV2014F0013 - CZN - Referral to Environmental Assessment - May22-14.pdf (45.09 KB) May 21, 2014 May 21, 2014
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
MV2014F0013 - CZN - New LUP Application - Further Studies Required - Nov8-18.pdf (260.72 KB) November 8, 2018 November 9, 2018

3. Amendment Application

Application and Related Docs
Document Received/Sent Uploaded
MV2014F0013 - CZN - MVLWB Response to Amendment Application - Jul8-14.pdf (59.52 KB) July 8, 2014 July 8, 2014
MV2014F0013 - CZN - Amendment Application - Jun24-14.pdf (178.62 KB) June 23, 2014 June 23, 2014

9. GIS Data

Shapefiles
Document Received/Sent Uploaded
MV2014F0013 - CZN - GIS data.zip (1.49 MB) March 13, 2019 March 13, 2019