Canadian Zinc Corporation - PC2014F0013
Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River.
This Permit is accompanied by Water Licence PC2014L8-0006
Please Note: This Permit and associated Water Licence are linked to the Mackenzie Valley Land and Water Board Land Use Permit MV2014F0013, Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002
Documents
- All Issuances (8)
- Application and Related Docs (58)
- Assorted Management Plans (57)
- Conceptual Closure and Reclamation Plan (10)
- Consultations - Reviews - Work Plans (19)
- Designs and As-Builts (13)
- Engagement Plan (5)
- Environmental Assessment (4)
- Inspection Reports (33)
- Operations and Notifications (28)
- Other (4)
- Other Monitoring Program (3)
- Preliminary Screening (3)
- Security and Water Use Fees (1)
- Sediment and Erosion Control (3)
- Shapefiles (1)
- SNP Reports (1)
- Spill - Contingency - Emergency Response (6)
- Technical Session (16)
- Waste Management Plan (5)
- Water Management (1)
- WEMP - Wildlife Effects Monitoring Program (7)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Extension to Term - Sept26_24.pdf (538.96 KB) | ||
CZN - Prairie Creek ASR - Correspondence - Nov17_21.pdf (122.65 KB) | ||
CZN - NNPR Letter to CZN Re Final Updated LUP and WL - June 7_21.pdf (762.29 KB) | ||
CZN - ASR Land Use Permit Administrative Amendments - June 7_21.pdf (1.26 MB) | ||
CZN - Letter Re Change of ITRP Member - May3_21.pdf (606.19 KB) | ||
PC2014F0013, PC2014L8-0006 – Canadian Zinc Corporation - Approval - ITRP Terms of Reference.pdf (31.83 KB) | ||
PC2014F0013 - CZN - Administrative Update - Issuance Letter with Permit Conditions revised - Nov28-19.pdf (1.15 MB) | ||
PC2014F0013 - CZN - Issuance Letter with Permit Conditions - Nov22-19.pdf (1.21 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Phase 1 Security Acceptance - Oct31_22.pdf (453.13 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PC2014F0013 - CZN - Report of Environmental Assessment - All-Weather Road - RFD - MVEIRB - Sept12-17.pdf (4.4 MB) | ||
PC2014F0013 - CZN - All-Season Road - Post-EA Information Pkg Required - Oct9-18.pdf (2.52 MB) | ||
PC2014F0013 - CZN - Minister to Review Board - Decision on EA - Oct9-18.pdf (141.27 KB) | ||
PC2014F0013 - CZN - Review Board to Minister - Letter to recommend approval of Report of EA - Sept12 -17.pdf (136.73 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PC2014F0013 - CZN - Preliminary Screening Determination - Aug 20_19.pdf (408.71 KB) | ||
PC2014F0013 - CZN - All Season Road - Preliminary Screening Determination - Staff Report and Comments - Aug 8_19.pdf (1.79 MB) | ||
PC2014F0013 - CZN - Preliminary Screening Notification to Review Board - Aug 9_19.pdf (386.43 KB) |