Canadian Zinc Corporation - PC2014L8-0006

Construction and use of an all weather road, with creek crossing structures exceeding 5m in width. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada.

This Water Licence is accompanied by Permit PC2014F0013

Please Note: This Water Licence and associated Permit are linked to the Mackenzie Valley Land and Water Board Land Use Permit MV2014F0013, Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002

Documents

Displaying 1 - 12 of 12
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
CZN Design Phase 1 Correspondence - PC Requirements - Dec1_22.pdf (188.75 KB) December 1, 2022 December 2, 2022
CZN DCP Phase 1 - Updated - Oct28_22.pdf (49.09 MB) September 28, 2022 November 30, 2022
CZN DCP Phase 1 - Updated - Parks Approval - Oct31_22.pdf (709.22 KB) October 31, 2022 November 30, 2022
CZN DCP Phase 1 Appendix B - Updated - Oct28_22.pdf (50.96 MB) October 28, 2022 November 30, 2022
CZN DCP Phase 1 CZN Response to Directives - Nov8_22_.pdf (181.89 KB) November 8, 2022 November 30, 2022
CZN DCP Phase 1 Directive Correspondence - Nov10_22_.pdf (192.21 KB) November 10, 2022 November 30, 2022
CZN - ASR - ICRP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB) August 22, 2022 September 21, 2022
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB) August 22, 2022 September 21, 2022
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB) January 17, 2022 January 19, 2022
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB) January 14, 2022 January 17, 2022
Operations and Notifications
Document Received/Sent Uploaded
PC - ASR - Notification of Commencemet Staging Area - Sep20_22.pdf (333.34 KB) September 20, 2022 September 20, 2022
CZN - ASR - Winter 2021-22 Construction Deferral - Dec20_21.pdf (282.32 KB) December 20, 2021 January 7, 2022