Canadian Zinc Corporation - PC2014F0013
Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River.
This Permit is accompanied by Water Licence PC2014L8-0006
Please Note: This Permit and associated Water Licence are linked to the Mackenzie Valley Land and Water Board Land Use Permit MV2014F0013, Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ITRP Panel Member Request Email Correspondence - Mar1_21.pdf (168.64 KB) | ||
CZN - ITRP Panel Member Request - Mar4_21.pdf (326.28 KB) | ||
CZN - Parks approval letter - ITRP TOR - Jan22_20.pdf (31.83 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Parks Canada Letter to CZN - Outstanding Wildlife Studies - Feb20_24.pdf (192.26 KB) | ||
CZN - Phase 1 Wildlife Plan - Approval - Oct31_22.pdf (541.66 KB) | ||
CZN - Phase 1 Wildlife Plan - Oct28_22.pdf (28.52 MB) | ||
CZN - WMMP - Conditions Summary and Conformity Table - Feb24_22.xlsx (31.17 KB) | ||
CZN - WMMP Letter to CZN - Jan25_22.pdf (638.16 KB) | ||
CZN - ASR - WMMP for Phase 1 - Aboriginal Consultation Letter - Dec16_21.pdf (290.43 KB) | ||
CZN - ASR - WMMP Review by PCA and ECCC - Nov26_21.xlsx (55.51 KB) |