Skip to main content

Northwest Territories Power Corporation - MV2022I0013

Taltson Hydroelectric Facility Transmission Line - Brushing and maintenance of the existing right of way for the transmission lines from the Taltson Hydroelectric Facility to Pine Point, Fort Resolution, and Fort Smith. Use of equipment. Drilling to identify the main cause(s) of anchor degradation along the Transmission Line.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 17 of 17
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
NTPC - Taltson - New Type A LUP Application - Sep19_22.pdf (5.86 MB)
NTPC - Taltson - Engagement Plan - Sept19_22.pdf (321.96 KB)
NTPC - Taltson - Engagement Log - Sept19_22.pdf (2.28 MB)
NTPC - Taltson - Spill Contingency Plan V1.1 - Sept19_22.pdf (2.22 MB)
NTPC - Taltson - Waste Management Plan V1.1 - Sept19_22.pdf.pdf (11.16 MB)
NTPC - Taltson - Erosion and Sediment Control Plan - Sept19_22.pdf.pdf (379.98 KB)
NTPC - Taltson - Wildlife Avoidance and Mitigation - Sept19_22.pdf.pdf (576.82 KB)
Draft Conditions.pdf (322.02 KB)
NTPC - New Permit Application - Incomplete - Sept12_22.pdf (191.74 KB)
NTPC - Taltson - New Type A LUP Application - Sep7_22.pdf (1.5 MB)
NTPC - Taltson - Engagement Plan - Sep7_22.pdf (320.31 KB)
NTPC - Taltson - Application - Engagement Log - Sep7_22.pdf (2.1 MB)
NTPC - Taltson - Spill Contingency Plan - V.11 - Sep7_22.pdf (2.39 MB)
NTPC - Taltson - Waste Management Plan V.11 - Sep7_22.pdf (11.01 MB)
NTPC - Taltson - Erosion and Sediment Control Plan - Sep7_22.pdf (372.32 KB)
NTPC - Taltson - Wildlife Avoidance and Mitigation Plan - Sep7_22.pdf (576.82 KB)
NTPC - Taltson - Application - Figures L150 Re-Anchor Study - Sep7_22.pdf (4.06 MB)