Northwest Territories Power Corporation - MV2022I0013
Status:
Issued
Authorization:
Land Use Permit
Activity:
Powerlines
Start:
November 8, 2022
Expiry:
November 7, 2027
Staff:
Andrew Wheeler
Taltson Hydroelectric Facility Transmission Line - Brushing and maintenance of the existing right of way for the transmission lines from the Taltson Hydroelectric Facility to Pine Point, Fort Resolution, and Fort Smith. Use of equipment. Drilling to identify the main cause(s) of anchor degradation along the Transmission Line.
Displaying 1 - 23 of 23
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Issuance - Type A Land Use Permit - Nov8_22.pdf (954.93 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
NTPC – Taltson Powerline - Notification - Preliminary Screening Determination - Oct28_22.pdf (500.95 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Inspection Report - January 11, 2023 - Jan27_23.pdf (1.58 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Phase 2 Notification - Borehole Locations - Jan11_23.pdf (3.25 MB) | ||
NTPC - Taltson Powerline - Phase 1 Notification - Anchor Excavation Locations - Jan11_23.pdf (2.51 MB) | ||
NTPC- Taltson Powerline Maintenance - Start Up Notification - Dec9_22.pdf (243.92 KB) |