Canadian Zinc Corporation - MV2014F0013
Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River. For non-federal portion of the road.
This Permit is accompanied by Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002
Please Note: This Permit and associated Water Licence are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006
Documents
- All Issuances (13)
- Annual Reports (7)
- Application and Related Docs (67)
- Assorted Management Plans (85)
- Conceptual Closure and Reclamation Plan (17)
- Consultations - Reviews - Work Plans (22)
- Designs and As-Builts (17)
- Engagement Plan (9)
- Environmental Assessment (6)
- Further Study Requested Sec. 22.2.b (2)
- Inspection Reports (10)
- Operations and Notifications (12)
- Other (1)
- Other Monitoring Program (3)
- Preliminary Screening (4)
- Security and Water Use Fees (3)
- Sediment and Erosion Control (7)
- Shapefiles (1)
- SNP Reports (1)
- Spill - Contingency - Emergency Response (2)
- Technical Session (8)
- Waste Management Plan (6)
- WEMP - Wildlife Effects Monitoring Program (7)
Document | Received/Sent | Uploaded |
---|---|---|
CZN – ASR - Approval - Sediment and Erosion Control Plan V3.3 - Oct14_22.pdf (174.54 KB) | ||
CZN - Prairie Creek ASR - SECP V3.3 - Sept13_22.pdf (9.38 MB) | ||
CZN - ASR – Not Approved - Sediment and Erosion Control Plan V3.2 - Sep1_22.pdf (191.12 KB) | ||
CZN -ASR - Sediment and Erosion Control Plan -June16_22.pdf (7.16 MB) | ||
CZN - ASR – Phase 1 Sediment and Erosion Control Plan V3 - Staff Report and Comments - Mar10_22.pdf (890.33 KB) | ||
CZN - ASR – Sediment and Erosion Control Plan V3 - Not Approved - Mar14_22.pdf (156.81 KB) | ||
CZN - Prairie Creek ASR - SECP V3 - Dec3_21.pdf (7 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - SCP V2 - Dec12_21.pdf (6.37 MB) | ||
CZN - ASR - SCP V2 - Staff Confirmation - Feb18_22.pdf (137.24 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ITRP Panel Member Request Email Correspondence - March 1_21.pdf (168.64 KB) | ||
MV2014F0013 MV2014L8-0006 MV2019L8-0002 - CZN - ITRP Panel Member Request - March 4_21.pdf (326.28 KB) | ||
MV2014F0013 - CZN - Independent Technical Review Panel Terms of Reference Dec4_19.pdf (210.91 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Wildlife Management and Monitoring Program -GNWT Conditions Met - Oct14_22.pdf (345.78 KB) | ||
CZN - ASR - GNWT Conditional Approval of WMMP Phase 1 - Aug10_22.pdf (424.6 KB) | ||
CZN - ASR - Phase 1 WMMP - Consultation Closed - Letter - Aug8_22.pdf (282.55 KB) | ||
CZN - 2022-05-25 DM Kelly to Mr. Boyd Clark - CZN Prairie Creek WMMP Consultation ADKFN - May26_22.pdf (339.17 KB) | ||
CZN - Prairie Creek ASR - WMMP for Phase 1 - Aboriginal Consultation Letter - Reply - Dec17_21.pdf (164.29 KB) | ||
CZN - Prairie Creek ASR - WMMP for Phase 1 - Aboriginal Consultation Letter - Dec16_21.pdf (290.43 KB) | ||
CZN - Aboriginal Consultation Approval of WEMP - Nov2_21.pdf (445.13 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – ASR – CRP - Version 1 - Review Comment Table - Apr 20_23.pdf (713.64 KB) | ||
CZN - ASR - CRP - Version 1 - Closure Workshop - CZN Presentation - May 15_23.pdf (1.52 MB) | ||
CZN-ASR-Closure Workshop - Summary Notes - May 16_23.pdf (322.18 KB) | ||
CZN - ASR - CRP - Version 1 - Closure Workshop - Presentation - May 15_23.pdf (867.04 KB) | ||
CZN - ASR - CRP - Version 1 - Closure Workshop - Agenda - May 12_23.pdf (282.52 KB) | ||
CZN - ASR - CRP - Version 1 - Closure Workshop - Agenda - DRAFT - May 8_23.pdf (304.79 KB) | ||
CZN - ASR - CRP - Version 1 - Review Comment Summary - Apr 26_23.pdf (435.33 KB) | ||
CZN – ASR – Not Approved - Closure and Reclamation Plan V1 - Apr26_23.pdf (630.71 KB) |