GNWT-INF - MV2023E0012

​The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within the area along the Mackenzie Highway between kilometre 278 and kilometre 800 which includes community access roads for Fort Simpson, Jean Marie River, Trout Lake, Willow Lake River Settlement,Wrigley as listed under the Highways Act, and Includes highway and airport Infrastructure: (I.e. roadway embankment,bridge, and culvert maintenance and replacement, winter road and Ice bridge construction and maintenance, airstrip surfacing and Ferry Services and Operations).

Rewnewal of MV2016E0006

Documents

Displaying 1 - 9 of 9
Uploaded On or After
Uploaded On or Before
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNW-INF - Letter of Acceptance from Waste Facility - Apr18_23.msg (97 KB) April 18, 2023 April 19, 2023
GNWT - INF - Draft Conditions - Apr14_23.pdf (345.73 KB) April 14, 2023 April 14, 2023
GNWT-INF - Renewal Application - Apr11_23.pdf (650.72 KB) April 11, 2023 April 11, 2023
GNWT-INF - Engagement Plan and Log - Apr11_23.pdf (950.25 KB) April 11, 2023 April 11, 2023
GNWT-INF - Equipment List - Apr11_23.pdf (134.24 KB) April 11, 2023 April 11, 2023
GNWT-INF - List of Quarries and Pit Run - Apr11_23.pdf (432.1 KB) April 11, 2023 April 11, 2023
GNWT-INF - Maps - Apr11_23.pdf (1.97 MB) April 11, 2023 April 11, 2023
GNWT-INF - Spill Contingency Plan - Apr11_23.pdf (419.25 KB) April 11, 2023 April 11, 2023
GNWT-INF - Waste Management Plan - Apr11_23.pdf (471.62 KB) April 11, 2023 April 11, 2023