Skip to main content

GNWT-INF - MV2023E0012

​The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within the area along the Mackenzie Highway between kilometre 278 and kilometre 800 which includes community access roads for Fort Simpson, Jean Marie River, Trout Lake, Willow Lake River Settlement,
Wrigley as listed under the Highways Act, and Includes highway and airport Infrastructure: (I.e. roadway embankment,bridge, and culvert maintenance and replacement, winter road and Ice bridge construction and maintenance, airstrip surfacing and Ferry Services and Operations).

Rewnewal of MV2016E0006

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT-INF - April 8 Inspection Report - April 22_24.pdf (8.06 MB)
GNWT - INF - Inspection Report - February 11_2024 - Mar18_24.pdf (7.84 MB)
GNWT-INF - Feb 28 Inspection Report - Mar 13_24.pdf (5.31 MB)