Northwest Territories Power Corporation - MV2022I0013

Taltson Hydroelectric Facility Transmission Line - Brushing and maintenance of the existing right of way for the transmission lines from the Taltson Hydroelectric Facility to Pine Point, Fort Resolution, and Fort Smith. Use of equipment. Drilling to identify the main cause(s) of anchor degradation along the Transmission Line.

Documents

Displaying 1 - 23 of 23
Uploaded On or After
Uploaded On or Before
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Issuance - Type A Land Use Permit - Nov8_22.pdf (954.93 KB) November 8, 2022 November 9, 2022
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
NTPC - Taltson - New Type A LUP Application - Sep19_22.pdf (5.86 MB) September 19, 2022 September 19, 2022
NTPC - Taltson - Engagement Plan - Sept19_22.pdf (321.96 KB) September 19, 2022 September 19, 2022
NTPC - Taltson - Engagement Log - Sept19_22.pdf (2.28 MB) September 19, 2022 September 19, 2022
NTPC - Taltson - Spill Contingency Plan V1.1 - Sept19_22.pdf (2.22 MB) September 19, 2022 September 19, 2022
NTPC - Taltson - Waste Management Plan V1.1 - Sept19_22.pdf.pdf (11.16 MB) September 19, 2022 September 19, 2022
NTPC - Taltson - Erosion and Sediment Control Plan - Sept19_22.pdf.pdf (379.98 KB) September 19, 2022 September 19, 2022
NTPC - Taltson - Wildlife Avoidance and Mitigation - Sept19_22.pdf.pdf (576.82 KB) September 19, 2022 September 19, 2022
Draft Conditions.pdf (322.02 KB) September 19, 2022 September 19, 2022
NTPC - New Permit Application - Incomplete - Sept12_22.pdf (191.74 KB) September 7, 2022 September 12, 2022
NTPC - Taltson - New Type A LUP Application - Sep7_22.pdf (1.5 MB) September 7, 2022 September 7, 2022
NTPC - Taltson - Engagement Plan - Sep7_22.pdf (320.31 KB) September 7, 2022 September 7, 2022
NTPC - Taltson - Application - Engagement Log - Sep7_22.pdf (2.1 MB) September 7, 2022 September 7, 2022
NTPC - Taltson - Spill Contingency Plan - V.11 - Sep7_22.pdf (2.39 MB) September 7, 2022 September 7, 2022
NTPC - Taltson - Waste Management Plan V.11 - Sep7_22.pdf (11.01 MB) September 7, 2022 September 7, 2022
NTPC - Taltson - Erosion and Sediment Control Plan - Sep7_22.pdf (372.32 KB) September 7, 2022 September 7, 2022
NTPC - Taltson - Wildlife Avoidance and Mitigation Plan - Sep7_22.pdf (576.82 KB) September 7, 2022 September 7, 2022
NTPC - Taltson - Application - Figures L150 Re-Anchor Study - Sep7_22.pdf (4.06 MB) September 7, 2022 September 7, 2022
Preliminary Screening
Document Received/Sent Uploaded
NTPC – Taltson Powerline - Notification - Preliminary Screening Determination - Oct28_22.pdf (500.95 KB) October 28, 2022 October 31, 2022
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Inspection Report - January 11, 2023 - Jan27_23.pdf (1.58 MB) January 27, 2023 January 30, 2023
Operations and Notifications
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Phase 1 Notification - Anchor Excavation Locations - Jan11_23.pdf (2.51 MB) January 11, 2023 January 17, 2023
NTPC - Taltson Powerline - Phase 2 Notification - Borehole Locations - Jan11_23.pdf (3.25 MB) January 11, 2023 January 17, 2023
NTPC- Taltson Powerline Maintenance - Start Up Notification - Dec9_22.pdf (243.92 KB) December 8, 2022 December 9, 2022