Northwest Territories Power Corporation - MV2022I0013
Status:
Issued
Authorization:
Land Use Permit
Activity:
Powerlines
Start:
November 8, 2022
Expiry:
November 7, 2027
Staff:
Andrew Wheeler
Taltson Hydroelectric Facility Transmission Line - Brushing and maintenance of the existing right of way for the transmission lines from the Taltson Hydroelectric Facility to Pine Point, Fort Resolution, and Fort Smith. Use of equipment. Drilling to identify the main cause(s) of anchor degradation along the Transmission Line.
Documents
Displaying 1 - 23 of 23
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Issuance - Type A Land Use Permit - Nov8_22.pdf (954.93 KB) | November 8, 2022 | November 9, 2022 |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
NTPC – Taltson Powerline - Notification - Preliminary Screening Determination - Oct28_22.pdf (500.95 KB) | October 28, 2022 | October 31, 2022 |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Inspection Report - January 11, 2023 - Jan27_23.pdf (1.58 MB) | January 27, 2023 | January 30, 2023 |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Taltson Powerline - Phase 1 Notification - Anchor Excavation Locations - Jan11_23.pdf (2.51 MB) | January 11, 2023 | January 17, 2023 |
NTPC - Taltson Powerline - Phase 2 Notification - Borehole Locations - Jan11_23.pdf (3.25 MB) | January 11, 2023 | January 17, 2023 |
NTPC- Taltson Powerline Maintenance - Start Up Notification - Dec9_22.pdf (243.92 KB) | December 8, 2022 | December 9, 2022 |