Canadian Zinc Corporation - MV2021D0005

​To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.

Documents

Displaying 1 - 2 of 2
Uploaded On or After
Uploaded On or Before
2. Initial/Renewal Application
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
CZN - Type A Licence and Permit Applications - Further Studies Requested - Staff Report - Jul28_21.pdf (316.17 KB) July 28, 2021 August 3, 2021
CZN - Type A Licence and Permit Applications - 22(2)b Further Studies Requested - Jul23_21.pdf (163.53 KB) July 23, 2021 July 23, 2021