Canadian Zinc Corporation - MV2021D0005

​Allied Licence: MV2021L2-0004

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
1. Permit - Licence - Other Issuances
Security and Water Use Fees
Document Received/Sent Uploaded
CZN - Security Deposit Transfer Accepted - Apr12_23.pdf (266.94 KB)
CZN - Closure Cost Decision - Phase 1 - Dec16_22.xlsm (596.87 KB)
CZN - Closure Cost Decision - Phase 2 - Dec20_22.xlsm (464.1 KB)
CZN - Closure Cost Decision - Phase 3 - Dec20_22.xlsm (462.59 KB)
CZN - Closure Cost Decision - Phase 4 - Dec16_22.xlsm (461.47 KB)
CZN - Security Correspondence - RE Mine Site Security - Oct13_22.pdf (118.32 KB)