Canadian Zinc Corporation - MV2019L2-0006

​To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal. 

On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.