Skip to main content

Canadian Zinc Corporation - MV2019L2-0006

​Licence Cancelled - April 26, 2023. All activities are scoped under Licence MV2021L2-0004.


To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal. 

On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 58 of 58
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - 2021 Annual Water Licence Report - Review Comment Table - Nov17_22.pdf (460.98 KB)
CZN - Acknowledgment - 2021 Annual Report - Nov28_22.pdf (183.04 KB)
CZN - 2021 Annual Report - Mar24_22.pdf (18.17 MB)
CZN - 2020 Annual Report - Staff Report and Comments - Jul28_21.pdf (529.85 KB)
CZN - 2020 Annual Report - Acknowledgement - Jul23_21.pdf (119.08 KB)
CZN - Mineral Exploration - 2020 Water Licence Annual Report - Apr 26_21.pdf (5.64 MB)
CZN - Mineral Exploration - Tabulated 2020 SNP Results - Apr 26_21.xlsx (33.17 KB)
CZN - Mineral Exploration - Tabulated 2020 SNP Results 3-4 - Apr 26_21.xlsx (48.61 KB)
CZN - Mineral Exploration - Tabulated 2020 SNP Results 3-4 with charts - Apr 26_21.xlsx (76.96 KB)
MV2008L2-0002 MV2019L2-0006 MV2014L8-0006 MV2019L8-0002 MV2014F0013 - CZN - Annual Reports - Staff Report and Comments.pdf (1.1 MB)
MV2019L2-0006 - CZN – 2019 Annual Reports - Accepted - Oct9-20.pdf (191.39 KB)
MV2019L2-0006 - 2019 Updated Water Licence Annual Report - Sept17-20.pdf (7.43 MB)
MV2019L2-0006 - CZN - 2019 SNP Results - May 21_20.xls (59.5 KB)
MV2019L2-0006 - CZN - 2019 Annual Report - May21_20.pdf (7.28 MB)
MV2019L2-0006 - CZN - 2019 SNP Results 3-4 - May 21_20.xls (62.5 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - Prairie Creek Mine Flood Protection Works - 2022 Annual Geotechnical Inspection - Mar 29_23.pdf (32.8 MB)
CZN - Letter to ENR Re Sept 22_2020 Licence Inspection Report - May 13_21.pdf (9.58 MB)
CZN - Licence Inspection Report Sept 22_2020 - April 23_21.pdf (9.36 MB)
MV2019L2-0006 - CZN - Annual Inspection - Flood Protection Work - Feb 3_21.pdf (7.62 MB)
MV2019L2-0008 - CZN Response to ENR Re Security - May 7-20.pdf (137.9 KB)
MV2019L2-0006 - CZN - ENR Letter to CZN Re Security Deposit - May4-20.pdf (2.02 MB)
MV2019L2-0006 - CZN - CZN's Response Re Licence Non-compliance and Security Deposit - Feb 27_20.pdf (109.14 KB)
MV2019L2-0006 - CZN - Non-Compliance Letter - Jan 23-20.pdf (2.41 MB)
MV2019L2-0006 - CZN - Annual Inspection - Flood Protection Work - Nov13_19.pdf (10.94 MB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - Water Withdrawal Points Proposed - Jun16_22.pdf (1.71 MB)
CZN - Inspector Response - Inquiry to work under MV2014L8-0006 WL for construction of Ice Bridge - Nov24_21.pdf (145.98 KB)
MV2019L2-0006 MV2019C0011 - CZN - Prairie Creek COVID-19 Logistics and Status - May11-20.pdf (214.44 KB)
MV2019L2-0006 MV2019C0011 - CZN - 2019 Closing Mine site Notification - Dec 5-19.pdf (76.65 KB)
MV2019L2-0006 - CZN - CZN Letter re EQC Exceedance and Non-Compliance - Sept22-19.pdf (1.74 MB)
Other
Document Received/Sent Uploaded
CZN - 2021 Geotechnical Inspection - Dec23_21.pdf (21 MB)
SNP Reports
Document Received/Sent Uploaded
CZN - SNP Report - July19-Aug23_22 Revised - Dec12_22.pdf (9.8 MB)
CZN - SNP Report - Aug31-Sep19, 2022 - Nov25_22.pdf (6.74 MB)
CZN - SNP Report - July 19 - August 23, 2022 - Oct26_22.pdf (9.9 MB)
CZN - SNP Report - Oct 12 - Nov 3 2021 - Revised - May17_22.pdf (7.8 MB)
CZN - SNP Report - Oct 12 to Nov 3 - Jan13_22.pdf (4.08 MB)
CZN - SNP Report - Sept 4 to Oct 5, 2021 - Nov4_21.pdf (2.93 MB)
CZN - SNP Report - Aug 17 to Sept 7, 2021 - Oct7_21.pdf (2.65 MB)
CZN - SNP Report - Jul 20 to Aug 10 2021 - Sep13_21.pdf (2.52 MB)
CZN - SNP Report - June 17-July 13, 2021 - Aug15_21.pdf (3.16 MB)
MV2019L2-0006 - SNP Report - Dec19_20.pdf (2.27 MB)
MV2019L2-0006 - CZN - SNP Report - Oct 15_20.pdf (3.3 MB)
MV2019L2-0006 - CZN - SNP Report - Sep 17_20.pdf (5.45 MB)
MV2019L2-0006 - CZN - SNP Report Jul 23 - Aug 13 - Sept10-20.pdf (2.84 MB)
MV2019L2-0006 - CZN - revised SNP Report Sept to Nov - Jan20_20.pdf (1.71 MB)
MV2019L2-0006 - CZN - 2019 Sept Oct SNP Report Inconformity - Dec 5-19.pdf (1.17 MB)
MV2019L2-0006 - CZN - Aug SNP Report - Sept 25-19.pdf (1.63 MB)
Spill Reports
Document Received/Sent Uploaded
CZN - Spill Report - August 1, 2022 - Aug2_22.pdf (453.3 KB)
CZN - Spill Report - Jun9_22.pdf (65.56 KB)
CZN - Spill Report - September 1, 2021 - Sep2_21.pdf (453.19 KB)
CZN - Spill Report - August 30, 2021 - Aug31_21.pdf (626.92 KB)
CZN - Spill Report - Jul7_21.pdf (452.59 KB)
CZN - Spill Report - Jun 11_21.pdf (452.61 KB)
MV2019L2-0006 - CZN -Spill Report - Nov 5_20.pdf (452.73 KB)
MV2019L2-0006 - CZN - Spill Report - Sept 3-20.pdf (425.54 KB)
MV2019L2-0006 - CZN - Spill Report - Sept10-20.pdf (425.69 KB)
MV2019L2-0006 - CZN - Spill Report - Aug20_20.pdf (441.42 KB)
MV2019L2-0006 - CZN - Spill Report - Jul12_20.pdf (444.99 KB)
MV2019L2-0006 - CZN - Spill Report - Aug13_20.pdf (447.8 KB)