Canadian Zinc Corporation - MV2019L2-0006

​To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal. 

On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.

Documents

Displaying 1 - 10 of 10
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Spill Reports
Document Received/Sent Uploaded
CZN - Spill Report - September 1, 2021 - Sep2_21.pdf (453.19 KB) September 1, 2021 September 2, 2021
CZN - Spill Report - August 30, 2021 - Aug31_21.pdf (626.92 KB) August 31, 2021 August 31, 2021
CZN - Spill Report - Jul7_21.pdf (452.59 KB) July 7, 2021 July 8, 2021
CZN - Spill Report - Jun 11_21.pdf (452.61 KB) June 14, 2021 June 14, 2021
MV2019L2-0006 - CZN -Spill Report - Nov 5_20.pdf (452.73 KB) November 17, 2020 November 17, 2020
MV2019L2-0006 - CZN - Spill Report - Sept 3-20.pdf (425.54 KB) September 30, 2020 September 30, 2020
MV2019L2-0006 - CZN - Spill Report - Sept10-20.pdf (425.69 KB) September 30, 2020 September 30, 2020
MV2019L2-0006 - CZN - Spill Report - Aug20_20.pdf (441.42 KB) September 3, 2020 September 3, 2020
MV2019L2-0006 - CZN - Spill Report - Jul12_20.pdf (444.99 KB) September 3, 2020 September 3, 2020
MV2019L2-0006 - CZN - Spill Report - Aug13_20.pdf (447.8 KB) September 3, 2020 September 3, 2020