Canadian Zinc Corporation - MV2019L2-0006
Status:
Issued
Authorization:
Licence
Activity:
Mining and Milling (2)
Start:
September 9, 2019
Expiry:
September 8, 2026
Staff:
Kim Murray
To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal.
On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.
Documents
Displaying 1 - 4 of 4
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
MV2019L2-0006 - CZN - Spill Contingency Plan (V2) - Staff Confirmation - Sept25-20.pdf (154.76 KB) | September 25, 2020 | September 25, 2020 |
MV2019L2-0006 - CZN - Spill Contingency Plan (V2) - Sept23-20.pdf (9.25 MB) | September 23, 2020 | September 24, 2020 |
MV2019L2-0006 MV2019C0011 - CZN - Spill Contingency Plan (V1.1) - Staff Confirmation - July 6_20.pdf (167.55 KB) | July 6, 2020 | July 7, 2020 |
MV2019L2-0006 MV2019C0011 - CZN - Spill Contingency Plan - Version 1.1 - June 30_20.pdf (9.25 MB) | June 30, 2020 | July 6, 2020 |