Canadian Zinc Corporation - MV2019L2-0006

​To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal. 

On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.

Documents

Displaying 1 - 6 of 6
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2019L2-0006 - CZN - Annual Inspection - Flood Protection Work - Feb 3_21.pdf (7.62 MB) February 3, 2021 February 3, 2021
MV2019L2-0008 - CZN Response to ENR Re Security - May 7-20.pdf (137.9 KB) May 7, 2020 May 8, 2020
MV2019L2-0006 - CZN - ENR Letter to CZN Re Security Deposit - May4-20.pdf (2.02 MB) May 4, 2020 May 4, 2020
MV2019L2-0006 - CZN - CZN's Response Re Licence Non-compliance and Security Deposit - Feb 27_20.pdf (109.14 KB) February 27, 2020 February 27, 2020
MV2019L2-0006 - CZN - Non-Compliance Letter - Jan 23-20.pdf (2.41 MB) January 23, 2020 January 23, 2020
MV2019L2-0006 - CZN - Annual Inspection - Flood Protection Work - Nov13_19.pdf (10.94 MB) November 13, 2019 November 13, 2019