Skip to main content

Northwest Territories Power Corporation - W2023L4-0001

​The Project is to store and divert water for hydroelectrical purposes within the Snare River Watershed.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Snare Hydro - 2023 Dam Safety Review - Jun 6_24.pdf (46.86 MB)
Snare Hydro - 2024 Annual Dam Inspection Report - Sep 6_24.pdf (7.49 MB)
Snare Hydro - Inspection Report - Aug 13, 2024 - Aug 20_24.pdf (3.23 MB)
Snare Hydro - NTPC Follow-up to August Inspection Report - Aug 28_24.pdf (950.06 KB)