Skip to main content

Kerry Smith - W2022W0005

​(This Permit was previously permitted under Permits W2015W0007, W2008W0012, and MV2003W0020). The Project is for a Wood Cutting Operation and is located at Km 172.5 on Highway 3, NT.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
Kerry Smith - Land Use Permit - Issuance Reasons for Decision - Jul 8_22.pdf (392.07 KB)
Kerry Smith - Land Use Permit - Jul 8_22.pdf (404.09 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
Kerry Smith - Land Use Permit Application - Maps - May 24_22.pdf (334.45 KB)
Kerry Smith - Draft Security Worksheet - May 24_22.pdf (54.91 KB)
Kerry Smith - Land Use Permit Application - May 24_22.pdf (753.22 KB)
Kerry Smith - Land Use Permit Application - Receipt - Application Fee - May 9_22.pdf (34.47 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Kerry Smith - Draft Permit - May 24_22.pdf (282.01 KB)
Preliminary Screening
Document Received/Sent Uploaded
Kerry Smith - Preliminary Screening Determination and Reasons for Decision - Jun 27_22.pdf (349.31 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Kerry Smith - Land Use Inspection Report - October 8 2024 - Oct 9_24.pdf (9.66 MB)
Kerry Smith - Land Use Inspection Report - September 27 2023 - Sep 28_23.pdf (5.45 MB)
Kerry Smith - Land Use Inspection Report - September 22 2022 - Sep 26_22.pdf (5.11 MB)
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
Kerry Smith - Engagement Plan and Record - May 24_22.pdf (1.02 MB)