Skip to main content

GNWT-INF - W2021L8-0002

This Licence entitles the Licensee to use Water and deposit Waste for miscellaneous activities at the Whatì Access Rehabilitation Project.The scope of this Licence includes the following:a) Withdrawal and use of Water from the Water Source identified in Part C, Condition 1 for dust suppression;b) Depositing of Waste to approved facilities;c) Construction, operation, and maintenance of a bridge; andd) Progressive Reclamation and associated Closure and Reclamation activities.

​​

Whati Access Road Upgrades including the replacement of two culverts with a bridge

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
GNWT-INF - Whati Access Rehabilitation Project - Annual Report - 2023 - Letter - Mar 27_24.pdf (47.38 KB)
GNWT-INF - Whati Access Rehabilitation Project - Annual Report - 2022 - Letter - Mar 29_23.pdf (44.02 KB)
GNWT-INF - Whati Access Rehabilitation Project - Annual Report - 2021 - Letter - Aug 9_22.pdf (42.92 KB)
Designs and As-Builts
Document Received/Sent Uploaded
GNWT-INF - Whatì Access Rehabilitation Project - Bridge Design and Construction Plan - Reasons for Decision - Mar 1_24.pdf (156.85 KB)
GNWT-INF - Whati Access Rehabilitation Project - Bridge Design and Construction Plan- Jan22_24.pdf (6.14 MB)
Operations and Notifications
Document Received/Sent Uploaded
GNWT-INF - Whati Access Rehabilitation Project - Notification - Mobilization on May 16 2024 - May 6_24.pdf (185.49 KB)