GNWT-INF - W2021E0007
Status:
Issued
Authorization:
Land Use Permit
Activity:
Road Public
Start:
August 2, 2021
Expiry:
August 1, 2026
Staff:
Anneli Jokela
This Permit entitles the Permittee to conduct the following land-use operation:a) Use of motorized earth-drilling machinery;b) Establishment and use of a campsite outside a Territorial Park;c) Establishment of a petroleum fuel storage facility with a capacity equal to or exceeding 80,000 L;d) Use of a stationary motorized machine and heavy equipment;e) Conduct a geotechnical study;f) Upgrade access road; andg) Replace culverts on the road with a bridge.
Whati Access Road Upgrades
Documents
- All Issuances (1)
- Application and Related Docs (6)
- Consultations - Reviews - Work Plans (2)
- Engagement Plan (1)
- Final Closure and Reclamation Plan (1)
- Inspection Reports (9)
- Operations and Notifications (3)
- Preliminary Screening (1)
- Spill - Contingency - Emergency Response (3)
- Waste Management Plan (4)
Displaying 1 - 31 of 31
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - Land Use Permit and RFD - Aug 2_21.pdf (579.14 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - Review Summary and Attachments - Jul 15_21.pdf (458.96 KB) | ||
GNWT-INF - Whati Access Rehabilitation Project - LUP and Type B WL App - Draft Permit - Jun 21_21.pdf (348.56 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - Preliminary Screening Notification and Determination - Jul 22_21.pdf (443.59 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - Notification - Mobilization on May 16 2024 - May 6_24.pdf (185.49 KB) | ||
GNWT-INF - Whati Access Rehabilitation Project - Notification - Contacts and Schedule - Aug 17_21.pdf (712.78 KB) | ||
GNWT-INF - Whati Access Rehabilitation Project - Notification - Drill Hole Locations - Aug 3_21.pdf (3.2 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - LUP and Type B WL App - Engagement Plan - V1.0 - Jun 21_21.pdf (312.97 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - SCP - Version 1.1 - Decision Letter - Sep 30_21.pdf (227.85 KB) | ||
GNWT-INF - Whati Access Rehabilitation Project - Spill Contingency Plan - V1.1 - Aug 30_21.pdf (988.64 KB) | ||
GNWT-INF - Whati Access Rehabilitation Project - LUP and Type B WL App - Spill Contingency Plan - V1.0 - Jun 21_21.pdf (726.97 KB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Whati Access Rehabilitation Project - LUP and Type B WL App - Closure and Reclamation Plan - V1.0 - Jun 21_21.pdf (1.31 MB) |