Skip to main content

CIRNAC-CARD - W2020L8-0003

This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; and
h) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.

Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).


Uploaded On or After
Uploaded On or Before
Displaying 301 - 383 of 383
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Rayrock - Spill Contingency Plan - Version 4.1 - Letter from Tlicho Government - Jun 2_23.pdf (751.73 KB)
Rayrock - Spill Contingency Plan - Version 4.0 - Reasons for Decision - May 1_23.pdf (455.14 KB)
Rayrock - Spill Contingency Plan - Version 4.0 - Mar 17_23.pdf (18.15 MB)
Waste Management Plan
Document Received/Sent Uploaded
Rayrock - Waste Management Plan - Version 5.0 - Part 1 - Sep 11_24.pdf (16.32 MB)
Rayrock - Waste Management Plan - Version 5.0 - Part 2 - Sep 11_24.pdf (16.18 MB)
Rayrock - Waste Management Plan - Version 5.0 -Part 3 - Sep 11_24.pdf (19.49 MB)
Rayrock - Waste Management Plan - Version 4.2 - Part 3 - May7_24.pdf (18.64 MB)
Rayrock - Waste Management Plan - Version 4.2 - Part 1 - May7_24.pdf (2.65 MB)
Rayrock - Waste Management Plan - Version 4.2 - Part 2 - May7_24.pdf (17.56 MB)
Rayrock - Waste Management Plan - Version 4.2 - Part 4 - May7_24.pdf (14.5 MB)
Rayrock - Waste Management Plan - Version 4.2 - Conformity confirmation - May 31_24.pdf (202.54 KB)
Rayrock - Waste Management Plan - Version 4.1 - Reasons for Decision - April 02_24.pdf (381.09 KB)
Rayrock - Waste Management Plan - Version 4.1 - Part 1 - Dec 21_23.pdf (7.71 MB)
Rayrock - Waste Management Plan - Version 4.1 - Part 2 - Dec 21_23.pdf (20.84 MB)
Rayrock - Waste Management Plan - Version 4.0 - Reasons for Decision - May 23_23.pdf (457.93 KB)
Rayrock - Waste Management Plan - Version 4.0 - Apr 13_23.pdf (11.54 MB)
Water Management
Document Received/Sent Uploaded
Rayrock - Waste Management Plan - Version 5.0 - Part 3 - Sep 11_24.pdf (19.49 MB)
Rayrock - MLWTP OMP - Reasons for Decision - Dec 14_23.pdf (407.18 KB)
Rayrock - MLWTP OMP - Main Report and Appendix A.pdf (3.21 MB)
Rayrock - MLWTP OMP - Appendix B - Part 5 of 8.pdf (19.98 MB)
Rayrock - MLWTP OMP - Appendix B - Part 6 of 8.pdf (19.93 MB)
Rayrock - MLWTP OMP - Appendix C.pdf (10.74 MB)
Rayrock - MLWTP OMP - Appendix D - Part 2 of 8.pdf (19.73 MB)
Rayrock - MLWTP OMP - Appendix D - Part 4 of 8.pdf (19.98 MB)
Rayrock - MLWTP OMP - Appendix D - Part 6 of 8.pdf (19.96 MB)
Rayrock - MLWTP OMP - Appendix D - Part 8 of 8.pdf (15.69 MB)
Rayrock - MLWTP OMP - Appendix E, F, G, H, I and J.pdf (17.39 MB)
Rayrock - MLWTP OMP - Appendix B - Part 1 of 8.pdf (16.09 MB)
Rayrock - MLWTP OMP - Appendix B - Part 2 of 8.pdf (19.87 MB)
Rayrock - MLWTP OMP - Appendix B - Part 3 of 8.pdf (19.64 MB)
Rayrock - MLWTP OMP - Appendix B - Part 4 of 8.pdf (19.81 MB)
Rayrock - MLWTP OMP - Appendix B - Part 7 of 8.pdf (19.97 MB)
Rayrock - MLWTP OMP - Appendix B - Part 8 of 8.pdf (16.52 MB)
Rayrock - MLWTP OMP - Appendix D - Part 1 of 8.pdf (12.61 MB)
Rayrock - MLWTP OMP - Appendix D - Part 3 of 8.pdf (19.96 MB)
Rayrock - MLWTP OMP - Appendix D - Part 5 of 8.pdf (19.95 MB)
Rayrock - MLWTP OMP - Appendix D - Part 7 of 8.pdf (19.79 MB)
Rayrock - MLWTP OMP - Appendix K - Part 1 of 2.pdf (6.57 MB)
Rayrock - MLWTP OMP - Appendix K - Part 2 of 2.pdf (19.79 MB)
Rayrock - MLWTP OMP - Appendix L and M.pdf (5.31 MB)
7. Monitoring Programs
AEMP - Annual Report
Document Received/Sent Uploaded
Rayrock - 2023 AEMP Annual Report - Decision Letter - Nov 12_24.pdf (176.81 KB)
Rayrock - 2023 AEMP Annual Report - Part 1 of 7 - May 31_24.pdf (6.52 MB)
Rayrock - 2023 AEMP Annual Report - Part 5 of 7 - May 31_24.pdf (17.6 MB)
Rayrock - 2023 AEMP Annual Report - Part 6 of 7 - May 31_24.pdf (1.74 MB)
Rayrock - 2023 AEMP Annual Report - Electronic Data File - Part 7 of 7 - May 31_24.zip (127.75 KB)
Rayrock - 2023 AEMP Annual Report - Part 2 of 7 - May 31_24.pdf (9.88 MB)
Rayrock - 2023 AEMP Annual Report - Part 3 of 7 - May 31_24.pdf (19.6 MB)
Rayrock - 2023 AEMP Annual Report - Part 4 of 7 - May 31_24.pdf (11.71 MB)
Rayrock - 2022 AEMP Annual Report - May 31_23.pdf (815.54 KB)
Rayrock - 2022 AEMP Annual Report - Baseline Report - May 31_23.pdf (11.8 MB)
Rayrock - 2022 AEMP Annual Report - Raw Data - May 31_23.zip (108.43 KB)
Rayrock - 2022 AEMP Annual Report - Baseline Report Appendices - May 31_23.pdf (29.23 MB)
AEMP - Program
Document Received/Sent Uploaded
Rayrock - AEMP Response Framework Update - IR Response Deadline Extension - Nov 25_24.pdf (284.73 KB)
Rayrock - AEMP Response Framework update - IR - Nov 04_24.pdf (270.53 KB)
AEMP - Response Plan and Cover letter - Water Quality - Jul 19_24.pdf (252.12 KB)
Rayrock - AEMP Response Framework Update - Jul 2_24.pdf (976.32 KB)
Rayrock - AEMP Design Plan - Version 1.1 - Decision Letter and Reasons for Decision - May 22_24.pdf (373.93 KB)
Rayrock - AEMP - Design Plan - Version 1.1 - Mar 1_24.pdf (21.52 MB)
Rayrock - AEMP - Design Plan - Version 1.1 - Extension Request - Decision Letter - Jan 30_23.pdf (207.99 KB)
Rayrock - AEMP - Design Plan - Version 1.1 - Extension Request - Jan 26_23.pdf (368.26 KB)
Rayrock - AEMP - Design Plan - Version 1.0 - Decision Letter and Reasons for Decision - Jul 5_22.pdf (764.79 KB)
Rayrock - AEMP - Design Plan - V 1.0 - Feb 16_22.pdf (6.56 MB)
Rayrock - AEMP - Design Plan - V 1.0 - Appendix A - Dec 18_20.pdf (12 MB)
Rayrock - AEMP - Design Plan - V 1.0 - Dec 18_20.pdf (17.01 MB)
8. Closure and Reclamation
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
Rayrock - Remedial Action Plan - Version 2.1 - Part 2 - Sep 27_24.pdf (19.47 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 5 - Sep 27_24.pdf (18.84 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 9 - Sep 27_24.pdf (18.52 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 10 - Sep 27_24.pdf (20.19 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 1 - Sep 27_24.pdf (1.07 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 3 - Sep 27_24.pdf (18.78 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 4 - Sep 27_24.pdf (21.31 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 6 - Sep 27_24.pdf (17.8 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 7 - Sep 27_24.pdf (14.35 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Part 8 - Sep 27_24.pdf (18.23 MB)
Rayrock - Remedial Action Plan - Version 2.1 - Status Letter - WLWB Response - Aug 29_24.pdf (192.62 KB)
Rayrock - RAP - V 2.1 - Correspondence between CIRNAC-CARD and WLWB Staff - Jun 27_24.pdf (263.34 KB)
Rayrock - Remedial Action Plan - Version 2.1 - Status Letter - Aug 16_24.pdf (212.14 KB)
Rayrock - Remedial Action Plan - Version 2.0 - Reasons For Decision - Mar 3_23.pdf (583.98 KB)
Rayrock - Proposed Closure Objectives and Criteria - Mar 1_2022.pdf (655.72 KB)
Rayrock - Closure Objectives and Criteria Workshop Agenda - Mar 1_22.pdf (180.28 KB)
Rayrock - Closure Objectives and Criteria Workshop PPT - Mar 14_22.pdf (5.01 MB)
Rayrock - Remedial Action Plan - Version 2.0 - Aug 18_22.pdf (1.02 MB)
9. GIS Data
GIS Data
Document Received/Sent Uploaded
Rayrock - GIS Data - Oct 5_21.zip (13.95 KB)