This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:
a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.
Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).
Displaying 101 - 126 of 126
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix E - Forms - Dec 22_22.pdf (368.4 KB) | ||
Rayrock - Confined Disposal Facility and Sun Main Waste Rock Cover Design Plans - Conformity Correspondence - Dec 22_22.pdf (318.32 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (489.1 KB) | ||
Rayrock - Email String - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (211.5 KB) | ||
Rayrock - CWWTP Results Analysis and Request for Discharge From SNP 1663-11 - Nov 06_23.pdf (114.99 KB) | ||
Rayrock - Notification - Intention to Commence Winter Road Construction - Feb 1_23.pdf (96.16 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - Confined Disposal Facility - Thermal Modelling - Jul 5_21.pdf (4.59 MB) | ||
Rayrock - Confined Disposal Facility - Hydrological Modelling - Sept 9_21.pdf (3.5 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Rayrock - GT21-604 - Spill Follow up Report for NTNU 2023-500 - Dec 12_23.pdf (4.18 MB) |