Skip to main content

CIRNAC-CARD - W2020L8-0003

This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; and
h) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.

Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).


Uploaded On or After
Uploaded On or Before
Displaying 1 - 56 of 56
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
Rayrock - Quarry Management Plan - Version 1.2 – Conformity Confirmation – Feb 8_24.pdf (218.09 KB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 1 - Jan 30_24.pdf (13.05 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 2 - Jan 30_24.pdf (12.71 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 3 - Jan 30_24.pdf (15.55 MB)
Rayrock - Quarry Management Plan - Version 1.2 - Part 4 - Jan 30_24.pdf (16.16 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Reasons for Decision - Nov 1_23.pdf (378.16 KB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 1 - Attachment A - Jul 19_23.pdf (1.75 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 2 - Appendices A-B - Jul 19_23.pdf (30.02 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 3 - Appendices C-E - Jul 19_23.pdf (9.4 MB)
Rayrock - Quarry Management Plan - Version 1.1 - Part 4 - Attachment B - Jul 19_23.pdf (1.18 MB)
Rayrock - Quarry Management Plan - Version 1.0 - Reasons for Decision - May 23_23.pdf (394.46 KB)
Rayrock - Quarry Management Plan - Version 1 - Part 1 - Apr 5_23.pdf (16.68 MB)
Rayrock - Quarry Management Plan - Version 1 - Part 2 - Apr 5_23.pdf (6.49 MB)
Engagement Plan
Document Received/Sent Uploaded
Rayrock - Engagement Plan - Version 4.0 - Decision Letter - Sept 29_22.pdf (187.92 KB)
Rayrock - Engagement Plan - Version 4.0 - Sept 19_22.pdf (1.62 MB)
Sediment and Erosion Control
Document Received/Sent Uploaded
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Reasons for Decision - Dec 14_23.pdf (322.24 KB)
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 1 of 2 - Oct 18_23.pdf (18.29 MB)
Rayrock - Sediment and Erosion Control Plan - Version 2.1 - Part 2 of 2 - Oct 18_23.pdf (5.66 MB)
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Reasons for Decision - May 23_23.pdf (477.94 KB)
Rayrock - Sediment and Erosion Control Plan - Version 2.0 - Mar 30_23.pdf (12.77 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Rayrock - Spill Contingency Plan - Version 4.2 - Part 1 - March 26_24.pdf (15.7 MB)
Rayrock - Spill Contingency Plan - Version 4.2 - Part 2 - March 26_24.pdf (13.82 MB)
Rayrock - Spill Contingency Plan - Version 4.2 – Conformity Confirmation – April 9_24.pdf (146.24 KB)
Rayrock - Spill Contingency Plan - Version 4.1 - Decision Letter - Jul 6_23.pdf (210.31 KB)
Rayrock - Spill Contingency Plan - Version 4.1 - Jun 7_23.pdf (21.4 MB)
Rayrock - Spill Contingency Plan - Version 4.1 - Letter from Tlicho Government - Jun 2_23.pdf (751.73 KB)
Rayrock - Spill Contingency Plan - Version 4.0 - Reasons for Decision - May 1_23.pdf (455.14 KB)
Rayrock - Spill Contingency Plan - Version 4.0 - Mar 17_23.pdf (18.15 MB)
Waste Management Plan
Document Received/Sent Uploaded
Rayrock - Waste Management Plan - Version 4.1 - Reasons for Decision - April 02_24.pdf (381.09 KB)
Rayrock - Waste Management Plan - Version 4.1 - Part 1 - Dec 21_23.pdf (7.71 MB)
Rayrock - Waste Management Plan - Version 4.1 - Part 2 - Dec 21_23.pdf (20.84 MB)
Rayrock - Waste Management Plan - Version 4.0 - Reasons for Decision - May 23_23.pdf (457.93 KB)
Rayrock - Waste Management Plan - Version 4.0 - Apr 13_23.pdf (11.54 MB)
Water Management
Document Received/Sent Uploaded
Rayrock - MLWTP OMP - Reasons for Decision - Dec 14_23.pdf (407.18 KB)
Rayrock - MLWTP OMP - Main Report and Appendix A.pdf (3.21 MB)
Rayrock - MLWTP OMP - Appendix B - Part 1 of 8.pdf (16.09 MB)
Rayrock - MLWTP OMP - Appendix B - Part 2 of 8.pdf (19.87 MB)
Rayrock - MLWTP OMP - Appendix B - Part 3 of 8.pdf (19.64 MB)
Rayrock - MLWTP OMP - Appendix B - Part 4 of 8.pdf (19.81 MB)
Rayrock - MLWTP OMP - Appendix B - Part 5 of 8.pdf (19.98 MB)
Rayrock - MLWTP OMP - Appendix B - Part 6 of 8.pdf (19.93 MB)
Rayrock - MLWTP OMP - Appendix B - Part 7 of 8.pdf (19.97 MB)
Rayrock - MLWTP OMP - Appendix B - Part 8 of 8.pdf (16.52 MB)
Rayrock - MLWTP OMP - Appendix C.pdf (10.74 MB)
Rayrock - MLWTP OMP - Appendix D - Part 1 of 8.pdf (12.61 MB)
Rayrock - MLWTP OMP - Appendix D - Part 2 of 8.pdf (19.73 MB)
Rayrock - MLWTP OMP - Appendix D - Part 3 of 8.pdf (19.96 MB)
Rayrock - MLWTP OMP - Appendix D - Part 4 of 8.pdf (19.98 MB)
Rayrock - MLWTP OMP - Appendix D - Part 5 of 8.pdf (19.95 MB)
Rayrock - MLWTP OMP - Appendix D - Part 6 of 8.pdf (19.96 MB)
Rayrock - MLWTP OMP - Appendix D - Part 7 of 8.pdf (19.79 MB)
Rayrock - MLWTP OMP - Appendix D - Part 8 of 8.pdf (15.69 MB)
Rayrock - MLWTP OMP - Appendix E, F, G, H, I and J.pdf (17.39 MB)
Rayrock - MLWTP OMP - Appendix K - Part 1 of 2.pdf (6.57 MB)
Rayrock - MLWTP OMP - Appendix K - Part 2 of 2.pdf (19.79 MB)
Rayrock - MLWTP OMP - Appendix L and M.pdf (5.31 MB)