Geotechnical investigation for a feasibility for a 13MW hydroelectric plant located at the La Marte Falls. The investigation requires the drilling of between 8 and 10 holes, 2 inches in diameter and 10 metres deep. Core samples will be removed for analysis and packer testing performed.