Skip to main content

EnCana Corporation - S99A-014

AEC(W) plans to drill a minimumof 2 holes in this area. Depending on results and weather,the program could be extended to 4 holes.The wells are to be drilled for oil. Road construction and ice crossings are scheduled for midt o late December,drilling is dependent on condition of the ice road from Wrigley to Norman Wells. It is scheduled to start February 1, 2000, but would be started earlier if road conditions permit. Includes O-47 (wellsite and sump), P-16 (wellsite and sump), O-74 (wellsite and sump), D-7 (wellsite and campsite).

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 15 of 15
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S99A-014 - Inspection Report - Aug14_25.pdf (513.77 KB)
S99A-014 - Inspection Report - Aug 1_06.pdf (60.44 KB)
S99A-014 - Inspection Report - Aug 25_03.pdf (67.15 KB)
S99A-014 - Inspection Report - Jun 27_01.pdf (85.56 KB)
S99A-014 - Inspection Report - Oct 16_00.pdf (59.42 KB)
S99A-014 - Inspection Report - May 29_00.pdf (190.65 KB)
S99A-014 - Inspection Report - Mar 29_00.pdf (70.12 KB)
S99A-014 - Inspection Report - Mar 21_00.pdf (46.62 KB)
S99A-014 - Inspection Report - Mar 7_00.pdf (85.39 KB)
S99A-014 - Inspection Report - Feb 9_00.pdf (81.71 KB)
S99A-014 - Inspection Report - Feb 8_00.pdf (115.34 KB)
S99A-014 - Inspection Report - Jan 25_00.pdf (155.11 KB)
S99A-014 - Pre-Inspection - Oct 13_99.pdf (141.87 KB)
Progress Reports
Document Received/Sent Uploaded
S99A-014 - O-74 Photograph log 2023 - Sep9_23.pdf (2.15 MB)
S99A-014 - O-47 Photograph log 2023 - Sep9_23.pdf (1.32 MB)