Délįnę Got’įnę Government - S25S-002
Status:
Issued
Authorization:
Land Use Permit
Activity:
Geotechnical
Start:
March 4, 2025
Expiry:
March 3, 2030
Staff:
Benjamin Roy
The OGG has contracted Northwest Hydraulic Consultant Services to perform geotechnical drilling for a feasible study for the Project located on the Great Bear River near DeJ,nE:, Northwest Territories. The exploration drilling program will consist of a minimum of up to 6 boreholes. The boreholes will up to a depth of 30 m or until confirmation of bedrock. Drilling pads will be prepared in suitable cleared areas. The purpose of the geotechnical investigation is to determine the presence and thickness of permafrost by penetrating and sampling frozen sediments.
Displaying 1 - 26 of 26
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S25S-002 - DGG - Issuance Package - Mar4_25.pdf (1.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S25S-002 - DGG - GNWT ECC Letter Acknowledging Receipt of Security - Mar11_25.pdf (50.73 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S25S-002 - DGG - Reviewer Comments and Proponent Responses - Feb12_25.pdf (62.79 KB) |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
S25S-002 - DGG - Ice Road to GT Drill Sites - Jan15_25.kmz (2.01 KB) | ||
S25S-002 - DGG - Powerhouse Location (proposed) - Jan13_25.kmz (733 bytes) | ||
S25S-002 - DGG - Power Canal (proposed) - Jan13_25.kmz (724 bytes) | ||
S25S-002 - DGG - Intake Structure to Canal (proposed) - Jan13_25.kmz (741 bytes) |