Skip to main content

GNWT-INF (Sahtu) - S21Q-004


The GNWT-INF is planning to develop a new quarry (Dhu-1). The Project includes the following physical works and activities:

• Construction of an approximately 4 kilometre (km) winter access road from km 966.6 of the Mackenzie Valley Winter Road (MVWR) to Dhu-1 quarry

• Development and operation of the Dhu-1 quarry to produce up to 600,000 m3 of crushed rock (“material”)

• Stockpiling of material

• Construction and operation of temporary facilities to service the Project such as laydown areas, construction camp, explosive storage/mixing facility, fuel storage, equipment maintenance and storage areas, water supply, power generation and waste management

• Stabilization of quarry faces and stockpiles and removal of camp and equipment

The quarry is not proposed to be closed and reclaimed after the Project, as the quarry is intended to remain available for future use.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
S21Q-004 - GNWT-INF - Dhu1 Quarry - Engagement Plan and Record - Sep 24_21.pdf (4.37 MB)