Skip to main content

GNWT-INF (Sahtu) - S20S-001

​INF is planning to construct a 13 kilometer all-season access road between Canyon Creek and Prohibition Creek, along the existing winter road alignment. The project is located southeast of Norman Wells, NT. A geotechnical assessment program is required to characterize subsurface conditions to inform and support engineering design for the future construction of the access road. The project is anticipated to be completed in the winter of 2020 with a minimum of 14 boreholes.  No camp is required and water use will be below the threshold required for a Licence.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 26 of 26
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S20S-001 - GNWT-INF PCAR - Decision Letter - Feb_14_20.pdf (1014.28 KB)
S20S-001 - GNWT-INF PCAR Land Use Permit - Feb_14_20.pdf (964.47 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
S20S-001- GNWT INF Final Plan Request - Feb 24_2022.pdf (327.56 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S20S-001 - Application Amendment - additional boreholes at Canyon Crk - Jan 15_20.pdf (697.14 KB)
S20S-001 - Draft Permit conditions - Jan 16_20.pdf (392.8 KB)
S20S-001 - PCAR LUP Application - Jan 10_20.pdf (665.53 KB)
S20S-001 - PCAR Geotechnical Project Description Report - Jan 10_20.pdf (11.86 MB)
S20S-001 - PCAR LUP Application cover letter - Jan 10_20.pdf (37.21 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S20S-001 - condition 1 satisfied- Mar 4_20.pdf (65.64 KB)
S20S-001 - Prohibition Creek AOA - PWNHC Review Letter Feb 12 2019 - Mar 4_20.pdf (329.96 KB)
S20S-001 - GNWT-INF Prohibition Creek AR Geotechnical Drilling Program LUP Application Staff Report 1 - Feb 3_20.pdf (314.9 KB)
S20S-001 - PCAR review comment table and attached letter - Fe 14_20.pdf (489.45 KB)
Preliminary Screening
Document Received/Sent Uploaded
S20S-001 - Preliminary Screening Determination Notification - Feb 14_20.pdf (1.05 MB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S20S-001 - Inspection Report - Jul 23_20.pdf (4.1 MB)
Operations and Notifications
Document Received/Sent Uploaded
S20S-001 - Inspector approval for disposal of excess drill mud - Mar 18_20.pdf (96.08 KB)
S20S-001 - Final borehole locations - Mar 4_20.pdf (1.71 MB)
S20S-001 - PCAR Project Notifications contacts and Refuleing Protools - Mar 10_20.pdf (521.37 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S20S-001 - Permafrost and Erosion Mitigation Contingency Plan - Mar 10_20.pdf (1.9 MB)
S20S-001 - PCAR Taditional Environmental Knowledge Report - Jan 10_20.pdf (3.97 MB)
S20S-001 - PCAR Den and Nest Survey Report - Jan 10_20.pdf (1.47 MB)
S20S-001 - PCAR Archaeological Overview Assessment - Jan 10_20.pdf (1.79 MB)
Engagement Plan
Document Received/Sent Uploaded
S20S-001 - PCAR Engagement Plan and Record - Jan 10_20.pdf (2.05 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20S-001 - PCAR Spill Contingency Plan version 1.1 - Mar 10_20.pdf (3.88 MB)
S20S-001 - PCAR Spill Contingency Plan - Jan 10_20.pdf (1.79 MB)
Waste Management Plan
Document Received/Sent Uploaded
S20S-001 - PCAR Waste Management Plan version 1.1 - Mar 10_20.pdf (2.61 MB)
S20S-001 - PCAR Waste Management Plan - Jan 10_20.pdf (1.17 MB)