Skip to main content

Enbridge Pipelines (NW) Inc. - S20L1-001

​Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 46 of 46
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S20L1-001 - Water Licence Cover Page - Sep 17_20.pdf (4.23 MB)
S20L1-001 - Enbridge Line 21 Pipeline KP158 - Decision Letter - Sep 17_20.pdf (994.76 KB)
S20P-003 - Enbridge Line 21 - Reasons for Decision - Sep 17_20.pdf (847.77 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
S20L1-001 - Letter to Enbridge Pipeline NW Inc - Security Deposit Cheque - Nov 20_20.pdf (500.17 KB)
S20L1-001 - Water Use Fee - Aug 7_20.pdf (34.76 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S20L1-001 - Cover Letter to SLWB re Revised Appendices - Sep 10_20.pdf (121.77 KB)
S20L1-001 - Environmental and Socio-Economic Assessment - Version 1.1 - Sept 10_20.pdf (31.27 MB)
S20L1-001 - Application Fee - Aug 7_20.pdf (46.35 KB)
S20L1-001 - Draft Water Licence Conditions - Enbridge KP158 - Jul 22_20.pdf (1.23 MB)
S20L1-001 - Appendix 3 - Revised Environmental and Socio-Economic Assessment - Jul 17_20.pdf (33.6 MB)
S20L1-001 - Appendix 7 - Equipment List - Jun 30_20.pdf (822.42 KB)
S20L1-001 -Type B Water License Application - Line 21 at KP158 - Jun 30_20.pdf (298.55 KB)
S20L1-001 - Appendix 1 - Certificate of Corporation - Jun 30_20.pdf (830.23 KB)
S20L1-001 - Appendix 3 - Environmental And Socio-Economic Assessment - Jun 30_20.pdf (50.79 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S20L1-001 - 2022 Annual Water Licence Staff Report - Oct27_23.pdf (3.39 MB)
S20L1-001 - Enbridge NW Response to GNWT Comments - Jun 16_23.pdf (153 KB)
S20L1-001 - Enbridge - Staff Report - Mar 2_22.pdf (455.52 KB)
S20L1-001 - Comment Letter - Mar 3_22.pdf (348.22 KB)
S20L1-001 -Enbridge Line 21 Replacement - KP158 - Staff Report - Aug 28 - Sep 17_20.pdf (2.88 MB)
S20L1-001-Enbridge Line 21 Review Comment Table and attached correspondence - Sep 17_20.pdf (1.52 MB)
S20L1-001 - Enbridge Line 21 Pipeline Replacement Project - Staff Report - Aug -27_20.pdf.pdf (5.35 MB)
Preliminary Screening
Document Received/Sent Uploaded
S20L1-001 - Enbridge Line 21 - Preliminary Screening RFD - Aug 28_20.pdf (3.91 MB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S20L1-001 - 2021 Annual Water Licence Report Notification - June30_22.pdf (177.47 KB)
S20L1-001 - 2023 Annual Water Licence Report - March31_23.pdf (206.43 KB)
S20L1-001 - Annual Water Licence Report Cover Letter - March 31_23.pdf (93.63 KB)
S20L1-001 - Year 2 Post-Construction Environmental Monitoring Report - March31_23.pdf (2.37 MB)
S20L1-001 - Annual Water Licence Report - Cover Letter - Mar 31_23.pdf (93.63 KB)
S20L1-001 - Annual Water Licence Report - Mar 31_23.pdf (206.43 KB)
S20L1-001 - Enbridge 2021 Annual Water Licence Report - KP158 Little Smith Creek - May 5_22.pdf (933.43 KB)
S20L1-001_2021_Annual_Water_Licence_Report_Letter_May5_22.pdf (92.38 KB)
S20L1-001_2021_Annual_Water_Licence_Report_KP_158_Little_Smith_Creek_May5_22.pdf (833.73 KB)
S20L1-001 - Enbridge - Water Licence Annual Report - Board Satisfaction Letter - Mar 3_22.pdf (171.91 KB)
S20L1-001 S20P-003 - Annual Report Cover Letter - Mar 31_21.pdf (92.18 KB)
S20L1-001 - Annual Water Licence Report - Mar 31_21.pdf (830.93 KB)
Inspection Reports
Document Received/Sent Uploaded
S20L1-001 Enbridge Industrial water use inspection Report Feb 11, 2021 - Mar 2_21 report.pdf (947.88 KB)
Operations and Notifications
Document Received/Sent Uploaded
S20L1-001 - S20P-003 - YK STF Acceptance Letter - KBL Waste Facility - Jan 22_21.pdf (307.63 KB)
S20L1-001 - S20P-003 - KP158 - Project Contact List - Jan 11_21.pdf (90.43 KB)
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
S20L1-001 - Appendix 8 - Engagement Plan and Summary - Jun 30_20.pdf (13.63 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S20L1-001 - Appendix 4 - Revised Spill Contingency Plan - Jul 17_20.pdf (4.58 MB)
S20L1-001 - Appendix 4 - Spill Contingency Plan - Jun 30_20.pdf (4.98 MB)
Waste Management Plan
Document Received/Sent Uploaded
S20L1-001 - Waste Management Plan Version 1.1 - Sept 10_20.pdf (7.24 MB)
S20L1-001 - Appendix 6 - Waste Management Plan - Jun 30_20.pdf (2.82 MB)
7. Monitoring Programs
Other Monitoring Program
Document Received/Sent Uploaded
S20L1-001 - Environmental Monitoring Report.pdf (2.37 MB)
8. Closure and Reclamation
Final Closure and Reclamation Plan
Document Received/Sent Uploaded
S20L1-001 - Closure and Reclamation Plan - Version 1.1 - Sep 10_20.pdf (5.69 MB)
S20L1-001 - Appendix 5 - Closure and Reclamation Plan - Jun 30_20.pdf (6.51 MB)
9. GIS Data
Shapefiles
Document Received/Sent Uploaded
S20L1-001 - Appendix 2 - Shapefiles KP158 - Jul 17_20.zip (377.92 KB)