Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Uploaded On or After
Uploaded On or Before
Displaying 1 - 10 of 10
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - GBRB Borehole Plan - Feb 28 _ 20.pdf (2.25 MB)
S19S-001 - Tulita As-Built Borehole Locations - Nov 1_ 19.pdf (182.58 KB)
Inspection Reports
Document Received/Sent Uploaded
S19S-001 - Inspection Report - Jul 23_20.pdf (5.92 MB)
S19S-001 - Inspection Report Oct 1 2019 - Oct 8_19.pdf (5.44 MB)
Operations and Notifications
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Drilling Work Completed - Mar 10_ 20.pdf (5.24 MB)
S19L8-002 - S19S-001 - Notification for Commencement of Work - GBRB Drilling - Feb 6_20.pdf (111.05 KB)
S19S-001- S19L8-002 - Notification - 10 Days Prior to Commencement of Work - Jan 17_20.pdf (103.03 KB)
S19S-001- S19L8-002 - Notification - 48 Hours Prior to Commencement of Work - Jan 27_20.pdf (118.26 KB)
S19S-001 - Correspondence - Granular Sites Summer Investigation Completed - Nov 1_ 19.pdf (481.36 KB)
Other
Document Received/Sent Uploaded
S19S-001 - Correspondence - Inquiry on Possibility of an Amendment Application - Nov 14_19.pdf (2.47 MB)