Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
6. Management Plans
Sediment and Erosion Control
Document Received/Sent Uploaded
S19S-001 - Sediment and Erosion Control Plan v. 2.0 - Mar 12_19.pdf (677.86 KB)
S19S-001 - Sediment and Erosion Control Plan - Great Bear River Bridge - Version 1 - Jan 29_19.pdf (675.93 KB)