Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Drilling Work Completed - Mar 10_ 20.pdf (5.24 MB)
S19L8-002 - S19S-001 - Notification for Commencement of Work - GBRB Drilling - Feb 6_20.pdf (111.05 KB)
S19S-001- S19L8-002 - Notification - 10 Days Prior to Commencement of Work - Jan 17_20.pdf (103.03 KB)
S19S-001- S19L8-002 - Notification - 48 Hours Prior to Commencement of Work - Jan 27_20.pdf (118.26 KB)
S19S-001 - Correspondence - Granular Sites Summer Investigation Completed - Nov 1_ 19.pdf (481.36 KB)