Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - GBRB Borehole Plan - Feb 28 _ 20.pdf (2.25 MB)
S19S-001 - Tulita As-Built Borehole Locations - Nov 1_ 19.pdf (182.58 KB)