Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 9 of 9
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S19S-001 - GBRB Review Comment Table and attached letters - Mar 8_19.pdf (1.13 MB)
S19S-001 - GNWT-INF Great Bear Bridge Geotechnical Investigation LUP Application Staff Report 1 - Mar 8_19.pdf (444.8 KB)
S19S-001 - Hamlet of Tulita - Sewage Waste Disposal approval - Feb 26_19.pdf (30.52 KB)
S19S-001 - Correspondence regarding TK study - Great Bear River Bridge - Feb 11_19.pdf (174.49 KB)
S19S-001 - Draft Land Use Permit Conditions - GNWT-INF - Feb 8_19.pdf (829.43 KB)
S19S-001 - Letters from PWNHC - Great Bear River Bridge - Feb 5_19.pdf (579.71 KB)
3. Amendment Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S19S-001 - S19L8-002 - Staff Report 2 - Jun 25_ 19.pdf (412.61 KB)
S19S-001 - S19L8-002 - Review Comment Table and attached letters - Jun 25_ 19.pdf (530.39 KB)
S19L8-002 - S19S-001 - Correspondence - Disposal of Sand and Drill Cuttings at Tulita Landfill - June 5_ 19.pdf (113.44 KB)