Skip to main content

GNWT-INF (Sahtu) - S19S-001

​Great Bear River Bridge Construction Geotechnical and Granular Materials Investigation. The Project scope is to investigate up to ten (10) prospect material sources for their potential to supply bedrock, aggregates, granular and common fill and to conduct drilling to determine geotechnical conditions in the area of proposed bridge abutments and roadway approaches during the winter and summer of 2019. A total of 88 boreholes and 126 test pits are proposed.

Associated Water Licence: S19L8-002

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S19S-001 - Land Use Permit Application - Great Bear River Bridge - Jan 21_19.pdf (850.83 KB)
S19S-001 - Project Description - Great Bear River Bridge - Jan 21_19.pdf (16.11 MB)
S19S-001 - Information Documents and Maps - Great Bear River Bridge - Jan 21_19.pdf (28.22 MB)
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
S19L8-002 - S19S-001 - DFO Self-Assessment - May 31_ 19.pdf (839.33 KB)
S19S-001 - S19L8-002 - Traditional Knowledge Study - Great Bear River Bridge - May 31_ 19.pdf (448.9 KB)
S19S-001 - S19L8-002 - Amendment Request - GBRB Cover Letter - May 15_ 19.pdf (125.22 KB)