Imperial Oil Resources N.W.T. Limited - S13L1-007
Status:
Issued
Authorization:
Licence
Activity:
Industrial
Start:
March 5, 2015
Expiry:
May 3, 2025
Staff:
Bonnie Bergsma
Type 'A' Water Licence for Imperial Oil's Norman Wells Operations. Licence is for the use of water, management of waste, and abandonment and reclamation activities.
Displaying 1 - 100 of 250
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S13L1-007 - As-Builts Goose Island to Island 3 - May 29_15.pdf (382.59 KB) | ||
S13L1-007 - As-Builts Upper Bosworth Bridge Repair - May 29_15.pdf (3.46 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S13L1-007 - Inspection Report - Mar 4_25.pdf (1.94 MB) | ||
S13L1-007 - Taiga Final Report - Water Analysis Results- Mar 4_25.pdf (463.03 KB) | ||
S13L1-007 - IORL - CIRNAC March 17 Inspection Report - Apr 19_22.pdf (932.98 KB) | ||
S13L1-007 - Imperial response to March 17 2022 Inspection Report - Apr 21_22.pdf (84.69 KB) | ||
S13L1-007 - follow up work in response to Oct 2019 Inspection - Mar 25_20.pdf (84.7 KB) | ||
S13L1-007 - CIRNAC Inspection Report for IORL - October 23 2019 - Nov 28_19.pdf (1.18 MB) | ||
S13L1-007 - CIRNAC Inspection Report March 5 2019 - Mar 14_19.pdf (1.84 MB) | ||
S13L1-007 - IORL Norman Wells - INAC - Inspection Report Nov 1 2017 - Nov 20_17.pdf (11.94 MB) | ||
S13L1-007 - INAC Inspection Report - Nov 14_16.pdf (512.52 KB) | ||
S13L1-007 - INAC Inspection - Jul 8_16.pdf (476.81 KB) | ||
S13L1-007 - AANDC Inspection Report - Dec 16_15.pdf (721.9 KB) | ||
S13L1-007 - AANDC Inspection Report - Jul 8_15.pdf (941.15 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S13L1-007 - Notification - River Water Intake - Rerouting and Repair - Jul 16_21.pdf (638.65 KB) | ||
S13L1-007 - Notification of postpone Artificial Island Repair Work - Feb 8_21.pdf (547.17 KB) | ||
S13L1-007 - Notification of Goose Island Flowlines Remediation Scope - Jun 9_20.pdf (169.22 KB) | ||
S13L1-007 - Notification of release of settling pond water - May 20_20.pdf (126.13 KB) | ||
S13L1-007 - Notification of Settling Pond Sample - May 25_20.pdf (198.01 KB) | ||
S13L1-007 - Release of Category B surface water - May 13_20.pdf (284.29 KB) | ||
S13L1-007 - Notification of relaese of settling pond water - May 20_20.pdf (126.13 KB) | ||
S13L1-007 - Settling Pond Cleaning notification - Sep 3_19.pdf (69.74 KB) | ||
S13L1-007 - CPF Impound Basin Start - Aug 20_19.pdf (546.63 KB) | ||
S13L1-007 - CPF In CPF Out CPF Grab - Aug 26_19.pdf (832.59 KB) | ||
S13L1-007 - Norman Wells shutdown notification - Mar 8_17.pdf (209.98 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S13L1-007 - Monthly Water Use Report - Mar 31_25.pdf (365.52 KB) |