Skip to main content

ConocoPhillips Canada - S13A-001

Conoco Phillips plans to drill two horizontal exploratory wells which will be hydraulically fractured and flow tested. Access, camps, water sources, and groundwater program will remain the same as those approved under S12A-005 and S12L1-005. Associated Water Licence is S13L1-004​.
Click here to view map

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S13A-001 - 2016 SLWB Annual Report - Nov 30_16.pdf (5.41 MB)
S13A-001 - Annual Report - Oct 31_14.pdf (6.05 MB)
Inspection Reports
Document Received/Sent Uploaded
S13A-001 - Summer Site Inspection Report - Oct 31_14.pdf (17.5 MB)
S13A-001 - Inspection Report - Aug 11_14.pdf (351.81 KB)
S13A-001 - Inspection Report - Feb 10_14.pdf (573.39 KB)
Operations and Notifications
Document Received/Sent Uploaded
S13A-001 - Passive Seismic Monitors Installation - Jan 19_14.pdf (15.5 KB)
S13A-001 - Canol Shale Potential Future Development and Effects Considerations - Discussion Paper - May 31_13.pdf (21.62 MB)